
A
SSEMBLY
STAGE
#4
Attach Mast
Assembly Hardware Required:
(*Hardware is Preinstalled in Base Assembly)
#26
Allen Bolt
Qty. 4
#28
Truss Screw
Qty. 2
#27
Curve Washer
Qty. 4
Assembly Description:
A)
Remove the preinstalled hardware (#26 & #27) from the
Main Frame Assm
(#1) mast mounting tube
.
B)
Connect the
Lower Data Cable Assembly
(#20) from the
Main Frame Assm
(#1) to the
Upper Data Cable
(#19)
located at the
bottom of the
Handlebar Mast
(#11).(FIG#2)
C)
Tuck the excess cable lengths into frame tubing and slide the
Mast Assm
(#11) down on to the
Main Frame
Assm
(#1). Align the mounting holes and secure the mast in place by using the previously installed; 4-
Allen Bolt
(#26) and 4-
Curve Washers
(#27).
D)
Fasten the
Bottle Rack
(#12) to the
Mast Assm
(#11) using hardware; 2-
Truss Screws
(#28).
E)
Insert the
Bottle
(#13) into
Bottle Rack
(#12).
♦
Assembly Stage #2 completed
12
11
13
27
26
28
19
A
SSEMBLY
I
NSTRUCTION
P
AGE
9
1
FIGURE #2
DATA CABLE
20