INSTALLATION (Day5)
5
Figure 3
Figure 4
U6
U4
U3
U4
assembled
U1
U2
A
U3
Playing
Court
Front side
Back
side
Place the Pole on the Anchor system.
Slide one Thick washer M16 (U3) over
each J-bolt (U2). Lift the Pole (A) onto
Anchor system, secure with one thick
washer (U3), one Lock washer M16 (U6)
and one Hex nut (U4) for each J-bolt.
See
Figure 3.
If the Main Post (A) is not exactly
vertical, adjust the 16mm J-Bolt Hex
Nuts (U4) located under the Post base
(A). Tighten all of the Hex Nuts (U4)
Above Post base when Main Post (A) is
vertical.
NOTE: Face the Main Post (A&B) with
Actuator Bracket facing away from playing
court (as shown in
FIGURE 4
).
1.
2.
Figure 5
8
12
12
9
12
8
E
E
B
A
E
E
DETAIL A
Attach Actuator mounting plate (E) to The
post (A).
Secure Actuator mounting plate to the bracket
welded on backside of Pole (A) with 4 Hex bolts
M12x30 (#8), 8 Flat washers M12 (#12), 4 Lock
nuts M12 (#9). See
Figure 5
.
Tighten all four nuts and bolts.
A hammer or mallet may be needed during assembly.
Note
:
Do
not
over tight all arm nuts and bolts. Failure to do so may cause tube damage
and make adjustment of system difficult.