Model 2100,2080,2000 Ver.14.0
33
IMPORTANT Airlock RE-LEASE ACTION
To re-lease an air lock in the circulation system open the pump union nut Diamond and Gold Silver version have
a 2 speed large pump installed the small circulation pump may have been installed (Option) please see your
purchase information. And let some water flow out of the pump then hand tighten the nut and power up again.
Prime mood (Pr) is displayed in control panel. Check again for small bubbles if they still are there from some of
the small jets then do it the same once again until the small bubbles doesn’t come out anymore. There should
only be coming out a stream of bubbles from one jet which is the ozone. Please note that once the jet pumps or
blower has started the the ozone will shut of for one hour and then automatically start again.