CONNECTION DIAGRAM
Mains
Supply
Isolation
Switch
SECTION FOUR
FLOODLIGHT TRANSMITTER:- OPERATION AND TESTING
WALK TEST PROCEDURE
The sensor can rotate from left to right, and tilt forward or backward. Adjust the sensor to point in
the required direction. (note diagram B)
The unit can be set up in daylight or at night. For daylight set up, do not remove the sticker
covering the photocell (daylight) sensor.
Turn the power to the unit on. The lamp will illuminate for approximately 30 seconds. This
indicates the unit is wired correctly.
After approximately 30 seconds the light will turn off.
Slide the TIME on switch to point to TEST setting. The light will now illuminate for approx 5
seconds after each detection to allow you to determine the detection pattern.
The LEDs will scroll from left to right, and on detection the LEDs will turn off.
The diagram below also shows the required connections for the addition of slave luminaires.
When adding slaves, be sure not to exceed the maximum switchable load (see Technical
Specifications).
SF-PTV180-500-T.qxd 13/04/2005 13:51 Page 5