background image

Assembly Instructions 

 

Tool Changer TK-35

 

WZW_TK-35_V2.0 

 

The  following  corrective  maintenance  can  be  carried  out  at  the 
owner’s: 

 

Replacing the seals of the coupling surfaces 

 

Replacing the locking piston/seals on the robot side 

 

Replacing the ball bushing on the robot side 

 

Replacing the tapered pins on the robot side 

 

Proceed as follows: 

Locking piston 

1. 

Undo fastening screws (1) 

2. 

T

Caution!

T

 Cover (2) under spring tension - when unscrewing 

the final two screws, press the cover on the robot flange 
downwards to prevent injuries due to the housing cover 
popping up 

3. 

Remove the compression spring (3) and locking piston (5). 
Remove the 4 hardened steel balls (8) from the locking pis-
ton 

4. 

You can now replace the piston seals 

Ball Bushing 

5. 

Carry out Items 1 -4 

6. 

Lay the main body (10) on the mounting surface 

7. 

Now use a rubber hammer to lightly tap the ball bushing (7) 
inwards towards the piston chamber 

8. 

Refit in reverse order 

9. 

Check tool changer as to function 

 

 

Tighten  all  screw  connectors  with  a  DIN-based 
tightening torque and lock to medium strength with 
a thread locking adhesive (e.g. Ergo 4052). 

Spare  parts  and  a  full  set  of  seals  can  be  obtained  through  the 
manufacturer. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flat head screw 

Ball Bushing 

Cover 

Balls 

Compression spring 

Closing cover 

Piston seal 

10 

Housing 

Locking piston 

11 

O-rings 

O-ring 

12 

Taper Pin 

 
 

9. 

8B

Dismantling, decommissioning, dis-

posal 

 

CAUTION! 

Before  dismantling  the  tool  changer,  the  energy 
supply  needs  to  be  disconnected  and  the  line 
system relieved of pressure. 

Make a note of the safety instructions and general 
hazards listed on Page 2. 

 

9.1. 

30B

Dismantling 

At  the  end  of  their  useful  lives,  the  tool  changer  must  be 
dismantled  and  disposed  of  in  an  environmentally  compatible 
manner. 

Properly 

clean 

sub-assemblies 

and 

components 

and 

disassemble them with consideration given to the prevailing local 
health & safety and environmental protection provisions. 

 

9.2. 

31B

Decommissioning 

You  carry  out  decommissioning  in  the  reverse  order  to 
commissioning. 

 

Any  tool  changer  malfunctioning  needs  to  be  corrected 
before decommissioning 

 

Tool changer needs to be cleaned  

 

Non-plugged connection openings need to be firmly closed 

 

9.3. 

32B

Disposal 

Pass  on  disassembled  parts  for  recycling  if  no  arrangements 
have been made for returning them or disposal: 

 

Turn metals into scrap. 

 

Hand in plastic elements for recycling. 

 

Sort the  rest of the  components  by material properties  and 
dispose of accordingly. 

 
 

10. 

9B

Accessories 

(Please  refer  to  the  ongoing  catalogue  or  the  internet  for 
individual tool changer accessories.) 

 

OPTION:   

 

Specifici splash-proof execution 

 

IP65 sealed electrical signal transmission 

 

Tool changer with internal routing 

 

Stainless Steel tool changer for pharmaceutical, medical 
and food industry 

 

10 

12 

11 

Содержание TK-35

Страница 1: ...acher Str 4 2 75031 Eppingen Germany Phone 49 0 7262 9239 100 Fax 49 0 7262 9239 400 E Mail service iprworldwide com Internet www iprworldwide com IPR Intelligente Peripherien für Roboter GmbH 2019 Translation of Original Assembly Instructions Table of contents 1 General 2 1 1 Information on these instructions 2 1 2 Terms of the guarantee 2 2 Safety 2 2 1 Symbol explanations 2 2 2 Intended use 2 2...

Страница 2: ...l changers are solely for attaching to machinery and equipment Do also follow their documentation NOTE You must use this tool changer exclusively in accordance with the operating conditions and performance specifications established in theses instructions 2 3 14BInappropriate use Any other use or one going beyond that described in the Intended Use chapter is deemed to be inappropriate and will voi...

Страница 3: ...a bevel in a receptacle With air pressure loss the balls are held in the receptacle by a spring integrated in the cylinder whereby an automatic locking is ensured with decrease of pressure Contacts fitted with springs are used for the signal transmission Thanks to the springs a bend of the contacts can be avoided The individual contact pins can be exchanged individually by a patch cord Thereby a h...

Страница 4: ... off procedure for the system The system is ready for operations following installation at the ro bot tool and when the compressed air is supplied Alternatively the system is shut down when the robot is immobilized and the supply of compressed air interrupted In the case of a drop in air pressure the system is automatically locked Only when the system is supplied with compressed air can the tool b...

Страница 5: ...ousing 5 Locking piston 11 O rings 6 O ring 12 Taper Pin 9 8BDismantling decommissioning dis posal CAUTION Before dismantling the tool changer the energy supply needs to be disconnected and the line system relieved of pressure Make a note of the safety instructions and general hazards listed on Page 2 9 1 30BDismantling At the end of their useful lives the tool changer must be dismantled and dispo...

Отзывы: