Maintenance Procedures – Winterising and Storage
44
Winterising and Storage
The following procedure should be followed if the machine will not to be used during Winter or
stored for any period longer than 1 month. A storage kit with all parts required is available
from Ionic Systems Ltd.
Holding Tank
The holding tank should be completely drained.
12v Pumps
After draining the tank, run 12v pumps until dry (no water is pumped).
De-pressurise
Prior to working on filters, de-pressurise the system. With neither water nor electricity
connected, press the green ‘Start’ button. After 30 seconds press the ‘Reset’ button. Drain
the Salt container by opening the drain valve. Refill the empty salt container to the
appropriate level and close the drain.
Sediment Filter
The 5 Micron Filter traps organic matter that will fester and degrade over time, for that reason
the sediment filter element should be removed from the filter housing and be discarded. The
large diameter spacer fitted to the top of the sediment filter element should be retained for
future use. A new Sediment filter element should be fitted prior to putting the machine back in
service. The sediment filter element should be replaced at 6-month intervals. Putting the
machine back into service at the end of storage creates a good opportunity to replace the
filter element.
Carbon Filter
The Carbon Filter also traps organic matter that will fester and degrade over time, for that
reason the carbon filter cartridge should be removed from the filter housing and be discarded.
A new Carbon filter cartridge should be fitted prior to putting the machine back in service. The
Carbon filter should be replaced after every 4-months whichever comes first. Putting the
machine back into service at the end of storage creates a good opportunity to replace the
carbon filter cartridge.
RO Membrane
The filter housing containing the RO Membrane should be removed from the machine and
drained and flushed with pure water for 10 minutes before refilling with pure zero TDS water.
Seal the pure water inside the RO housing by fitting blanks into all of the JG fittings. The
housing needs to be stored vertically and can be refitted into the machine for this purpose.
DO NOT EXPOSE TO FREEZING CONDITIONS. Prior to putting the machine back into
service, take the RO filter housing and remove all three blanks and drain the pure water from
the filter housing. Fit a hose adaptor to the top JG fitting in the cap and flush again with pure
water for 3 minutes. After flushing, drain before refitting to machine.
Содержание Zero PPB
Страница 1: ...1 Operators Manual...
Страница 5: ...Zero Weights Dimensions 5 Dimensions...
Страница 7: ...Machine Component Identification 7 Component Identification...
Страница 8: ...Machine Component Identification 8 Control Panel...
Страница 10: ...Machine Component Identification 10 Zero System Filters Removed...
Страница 13: ...Machine Component Identification 13 Filter Identification Zero PPB System...