26
INSTALLATION AND ASSEMBLY
iV-Office ventilation device
•
Installation and operating instructions
►
From the exterior wall side, attach the 9-mm
sealing tape circumferentially flush with the guide
on the base plate.
Be careful
not to seal the fixing holes.
TIP:
Do not apply the sealing tape until immediately
before installing the base plate. This prevents the
sealing tape from swelling too much and makes
installation easier.
►
Insert the rawl plugs into the boreholes.
►
Screw the weather protection hood base plate
into the rawl plugs using 4 screws and washers.
TIP:
When attaching the base plate of the Flex Office
weather protection hood to exterior walls with insulation,
use wallplugs for insulation for fixing purposes. These are
not included in the scope of supply, they are available
as an option.
►
Place the cover onto the base plate from the top.
►
Slide the cover downwards as far as the stop.
Ensure
that the guides on the cover hook
in behind the base plate.
►
Seal the joint between the cover and the exterior
wall at the sides and top with a permanently
elastic exterior sealant.
NOTE
: If the joint between the base plate
and façade is sealed incorrectly,
the cover
cannot be fitted.
•
After fitting the cover, seal the joints
between the cover and façade using
permanently elastic exterior sealant
on both sides and at the top.
The Flex Office weather protection hood is installed.
4 x