112
SAVE THESE INSTRUCTIONS
Page 8
(112) MODEL 6220 KRYSTAL CLEAN POOLWATER SYSTEM ENGLISH 7.5” X 10.5” PANTONE 295U 12/25/2006
SS
EE
TT
--UU
PP
II
NN
SS
TT
RR
UU
CC
TT
IIOO
NN
SS
SET-UP INSTRUCTION
1.
Assemble the above-ground-pool (AGP) and its filter pump per
installation instructions.
2.
Remove the saltwater system and it’s
accessories from the packaging.
3.
Lift up the saltwater tank from the
position it was stored in. See Fig. 1.
4.
Flip the saltwater tank over. Press it
downward onto the base as shown.
Make sure the tank is securely
connected to the base. See Fig. 2.
5.
In a clockwise motion screw the salt
container
(7)
to the underneath of
tank cover
(3)
. See Fig. 3.
6.
Attach the cover to the saltwater tank.
Lock the cover clips
(4)
on the handle
of the tank. See Fig. 4.
7.
Connect the hose to the saltwater
pool system inlet. For installation: see
page 9 for 1-1/4" hose and page 10
for 1-1/2" hose connections.
Fig (1)
Fig (2)
Fig (3)
Fig (4)
2
1
2
1
3
3
9
4
9
9
7
IMPORTANT
• The saltwater system must be installed as the last piece of pool
equipment in the water return line to the pool as displayed in Fig. 6.
This location extends the life of the titanium plates.
• Disassemble the heater and accessories within the circulation line
before use.