68
11.4 Pressure sensor
Pressure sensors (when used) can be checked in the menu overview every 6 months (Menu 5, Status 2).
Pressure sensor, pumps P(ADr):
Pressure sensor, blower P(ADg) (optional):
When the pressure sensor is not connected the pressure displays -1.200 bar.
11.5 Blower
Blower AL-BL30 -AL BL200
AQUALOOP blowers
are oil-less. Never lubricate them!
All blowers have already been precisely adjusted. Never disassemble them!
(Do not try to loosen the hex-bolts on the endcap)
Replacing the filter element:
It is recommended that the filter element(s) is cleaned or replaced depending running time and the
surrounding air quality. The filter element(s) should be checked every 6 months and should be replaced
every 4 years.
Detailed information can be found in the separate blower instruction manual (MEDO LA Blower (AL-BL30
-AL BL200) which is included with the blowers.
Blower AL-BL400 -AL BL3600
Replacing the bearing (AL-BL400 -AL BL3600):
It is recommended that the bearing
Set Assembly
is replaced after 40,000 h working hours. See blower O&M manual.
Detailed information can be found in the separate blower instruction manual (FPZ side channel blower)
which is included with the blowers.
Содержание AQUALOOP GW 10800
Страница 10: ...9 Tab Official listing https www intewa de en applications rain greywater harvesting greywaterrecycling...
Страница 12: ...11 Fig AQUALOOP System 1200 L day 317 GPD Fig AQUALOOP System 1800 L day 476 GPD...
Страница 13: ...12 Fig AQUALOOP System 3600 L day 952GPD Fig AQUALOOP System 5400 L day 1428 GPD...
Страница 37: ...36 Fig Electrical connection plan upper pump lower pump...
Страница 39: ...38 Fig Control cabinet of multiple membrane station controller...
Страница 42: ...41 7 1 3 Expansion membrane station controller Fig Control cabinet of expansion controller...
Страница 89: ...88 Designed and provided by INTEWA GmbH or to be separately approved alternative...
Страница 90: ...89 INTEWA GmbH Version 1 1 a Subject to technical changes...