All internal electrical wiring is completed at the factory. All external wiring must 

conform to the National Electric Code and any local codes. Line voltage leads utilize 

wire nut connections.  

A surge suppressor should be installed to protect control board. 

Surge suppressors are available now that mount to your breaker box 

providing protection to your whole house. 

 

Refer to the wiring diagrams for all field wiring. 

A.

 

Field connections should be protected with a 15-amp fuse. 

B.

 

Install the room thermostat on an inside wall away from cold drafts, 

windows, or heat from fireplaces, appliances, or sunlight. Set the heat 

anticipator at .1 amps. Connect the thermostat leads to the yellow wires on 

control board. 

C.

 

Install a separate fused disconnect switch near the unit so power can be 

shut off for servicing. 

D.

 

Shut off service switch when the boiler is not in use for extended periods. 

E.

 

Failure to provide surge protection will void control board warranty

 

WARRANTY 

The limited warranty is not applicable unless these installation instructions are 

followed. 

 

HOMEOWNER INFORMATION 

A.

 

COMBUSTION AIR SUPPLY 

Your burner requires an ample amount of clean combustion air in order, to 

completely and efficiently burn its fuel. If an ample supply is not available 

erratic operation, noise combustion, and fuel odours in the air may result. 

REMEMBER THAT VENTING FANS OR A VENTER DRYER WILL GREATLY 

INCREASE THE NEED FOR OUTSIDE AIR. 

B.

 

AREA AROUND THE BOILER 

The area around the boiler should be kept clean and free or any combustible 

materials, particularly oily rags or papers. The boiler should be accessible for 

ease of service. 

 

SERVICE INFORMATION 

To avoid unnecessary expense and inconvenience, the boiler and burner, should be 

inspected at least once a year by a qualified serviceman. If difficulty occurs, the 

following should be observed before calling the serviceman: 

A.

 

Check to see if the thermostat setting is above room temperature 

B.

 

Check to see if the service switch is in the on position 

DO NOT TAMPER WITH THE UNITS OR CONTROLS 

 

 

POWER FAILURE 

In case of power failure the combustion fan will stop and the fuel feeding motors will 

stop feeding fuel to the fire pot. If this happens switch the primary control on/off 

switch to DRAFT FAN. Should the power come back while the fire is smouldering the 

emissions will be evacuated from the boiler, also this will prevent fuel from being fed 

into the fire pot. When power is resumed and the fire is extinguished the boiler can be 

safely restarted following the START-UP INSTRUCTIONS. 

Содержание Pinnacle PB150

Страница 1: ...these instructions could result in property damage bodily injury or even death Contact local building or fire officials about restrictions and installation inspection requirements in your area SAVE T...

Страница 2: ...REQUIREMNETS figure 2 11 DAMPER CONTROLS 11 WARNING ABOUT CHIMNEY FIRES 12 DOMESTIC WATER SYSTEM DIAGRAM figure 3 13 DOMESTIC WATER COIL REQUIREMENTS figure 4 14 PARALLEL SYSTEM DIAGRAM figure 5 16 SY...

Страница 3: ...HEIGHT 62 WIDTH OVERALL 47 DEPTH 29 HOPPER CAPACITY 160 lbs WEIGHT 585 lbs FLUE SIZE 4 BREACH LEFT SIDE DOMESTIC HOT WATER COIL GPM 5 gal 5 GPM 40 F to 140 F boiler water temperature at 200 F WATER CO...

Страница 4: ...3 SPECIFICATIONS Figure 1...

Страница 5: ...d BOILER LOCATION Boiler to be installed on a non combustible heat resistant surface in a liquid containment pan attached to a drain in a level position with clearances in accordance with NFPA 31 Tabl...

Страница 6: ...de of the boiler The safety relief valve should be piped to a place of safe discharge Install your air bleed connection into the 90 elbow mounted in the top tapping behind the smoke collector box Inst...

Страница 7: ...t from a broken or leaking radiator or pipe or a cracked section in the boiler SEQUENCE OF OPERATION Forced Circulation Hot Water System with Tank less Heater When the room temperature falls below the...

Страница 8: ...ith the On Time pre set at 2 minutes and the Cycle Time set at 16 minutes the unit would come on feed corn for 2 minutes and not feed corn for 14 minutes This gives you a complete cycle time of 16 min...

Страница 9: ...temperature exceeds 95 C 200 F in a furnace supply plenum on hot air furnaces the automatic fuel feed is interrupted f Check that if there is a failure of the fan providing combustion air the automat...

Страница 10: ...r regulator or mechanical vent I 6 ft 182 cm To service regulator vent outlet J 3 ft 91 cm From any forced air intake of other appliance K 48 in 122 cm Clearance to non mechanical air supply inlet to...

Страница 11: ...high temperature silicone Class PL connector should maintain a pitch on rise from the furnace to the chimney of at least per foot A LISTED 4 STAINLESS STEEL LINER MUST BE USED IN MASONRY CHIMNEYS You...

Страница 12: ...DAMPER IN THE EXHAUST VENTING SYSTEM OF THIS UNIT and DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE BOILER DAMPER CONTROLS Damper operation The damper is a plate that helps cont...

Страница 13: ...ent immediately 2 Alert others in the house to evacuate 3 Close the appliance s dampers and or the primary air inlet controls limiting the fire s air supply and reducing its intensity 4 Open the appli...

Страница 14: ...13 Figure 3...

Страница 15: ...upply side exiting the domestic water coil see figure 5 Drain valve piping should be piped to a safe area for discharge Failure to install pressure temperature relief value will void boiler warranty P...

Страница 16: ...15 Figure 5...

Страница 17: ...16 Figure 6...

Страница 18: ...ustion air in order to completely and efficiently burn its fuel If an ample supply is not available erratic operation noise combustion and fuel odours in the air may result REMEMBER THAT VENTING FANS...

Страница 19: ...GND Pimary Control L1 L2 N H B C 2 4 1 3 B B R R W Power Requirements 110 Volts 15 Amps max Wire through a service switch Surge protection required RED RED WHITE BLACK ORANGE RED YELLOW YELLOW WHITE...

Страница 20: ...When burning corn the primary combustion takes place on a fluidized bed at the bottom of the fire pot That s why the corn pot has a slide bottom The slide bottom corn pot will need to be cleaned about...

Страница 21: ...350S cycle time switch at 8 minutes and pilot draft switch at Medium Turn on service switch 9 Place two 4 cups of pellets in the bottom of the fire pot Apply a non volatile lighting material on top of...

Страница 22: ...sture Content 8 maximum Heat Content approximately 8200 Btu per pound minimum ASH The ash content of the fuel and operation of your boiler will directly determine the frequency of cleaning The use of...

Страница 23: ...exchanger 8 Re assemble the top of the boiler 9 On a non combustible surface well away from combustible materials have ready a fireproof container with a tight fitting lid to receive ash Open the fir...

Страница 24: ...ll shut down the burner to pilot mode until the water temperature drops below the low limit setting minus the differential setting If the low limit setting is 170 F and the differential is 25 F this m...

Страница 25: ...rkmanship in covered components and that the other terms and conditions of this warranty have been complied with the manufacturer s sole duty and liability under this warranty shall be limited to the...

Страница 26: ...eck for power at the power switch If the meter indicates 115v and the light still doesn t come on replace the control board STEP 3 CONFIRM DRAFT FAN OPERATION Be sure the main power switch is in the D...

Страница 27: ...he boiler INSTALLATION ADJUSTMENT RELATED PROBLEMS PROBLEM Incomplete combustion unburned fuel SOLUTION 1 Adjust air shutter to a more open position 2 Make sure of correct chimney is chimney drafting...

Страница 28: ...ERATOR RELATED PROBLEMS PROBLEM Feed system does not lock in SOLUTION Repeat start up using more fuel PROBLEM Boiler will not start up after power outage SOLUTION Check manual reset on feed system PRO...

Страница 29: ...illow block ball bearing F000505P 9 Manual reset F000105P 3 Cutting blades 2 ea F000513P 2 10 Auger motor F000102P 4 Fuel metering cup F130512P 11 Auger shaft assembly F150293P 5 lovejoy coupling F000...

Страница 30: ...29 NOTES...

Отзывы: