background image

 

11 

 

 

 

VENTING 

GENERAL- A PELLET/CORN FIRED UNIT SHALL BE CONNECTED TO A FLUE HAVING 

SUFFICIENT DRAFT AT ALL TIMES TO ASSURE PROPER OPERATION. 

 

1.

 

Only a trained experienced serviceman should attempt the installation or 

service of any boiler and or venting device. All venting installations must 

comply with the recommendations of the venting manufacturer and with all 

state and local codes. Only use listed PL type venting with an inside diameter of 

4 inches. Warning, used chimney venting must be clean and in good condition. 

 

2.

 

All joints must be securely locked together, caulked with high temperature 

silicone and fastened with at least 3 screws. This will prevent leakage and 

future disassembly. 

 

3.

 

PL Vent must be supported from the structure by means of metal or other non-

combustible supports; horizontal pipes shall be supported at intervals not 

exceeding 3 ft (1 m), exterior vertical pipes shall be supported at intervals not 

exceeding 6ft (2 m). 

 

4.

 

DO NOT INSTALL A FLUE DAMPER IN THE EXHAUST VENTING SYSTEM 

OF THIS UNIT; and DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE 

SERVING ANOTHER APPLIANCE. 

 

 

 

 

 

BOILER DAMPER CONTROLS 

Damper operation 

The damper is a plate that helps control the amount of airflow supplied for proper 

combustion. With the damper pushed all the way in the airflow is at its minimum. As 

the damper is pulled out, more air is allowed to flow. 

 

It will be necessary to monitor the appearance of the flame during the first 4-8 bags 

of fuel. If your flame is smoky red/orange with evidence of soot at the top of the 

flame, you need more combustion air, pull the damper out ¼ inch and re-evaluate the 

appearance of the flame. It may be necessary to repeat this process, moving the 

damper ¼ inch at a time until proper combustion is attained (the flame should 

become yellow and begin to “dance”). Tighten the damper lock down bolt and monitor 

flame to maintain proper combustion. 

 

Symptoms of insufficient combustion air include unburned fuel, lazy smoky 

or red/orange flame, excessive ash or soot, excessive build-up on glass. 

 

Symptom of excessive combustion air include fuel burns to quickly (smoking 

or smouldering pellets), white to yellow flame. 

 

 

 

Содержание Pinnacle PB150

Страница 1: ...these instructions could result in property damage bodily injury or even death Contact local building or fire officials about restrictions and installation inspection requirements in your area SAVE T...

Страница 2: ...REQUIREMNETS figure 2 11 DAMPER CONTROLS 11 WARNING ABOUT CHIMNEY FIRES 12 DOMESTIC WATER SYSTEM DIAGRAM figure 3 13 DOMESTIC WATER COIL REQUIREMENTS figure 4 14 PARALLEL SYSTEM DIAGRAM figure 5 16 SY...

Страница 3: ...HEIGHT 62 WIDTH OVERALL 47 DEPTH 29 HOPPER CAPACITY 160 lbs WEIGHT 585 lbs FLUE SIZE 4 BREACH LEFT SIDE DOMESTIC HOT WATER COIL GPM 5 gal 5 GPM 40 F to 140 F boiler water temperature at 200 F WATER CO...

Страница 4: ...3 SPECIFICATIONS Figure 1...

Страница 5: ...d BOILER LOCATION Boiler to be installed on a non combustible heat resistant surface in a liquid containment pan attached to a drain in a level position with clearances in accordance with NFPA 31 Tabl...

Страница 6: ...de of the boiler The safety relief valve should be piped to a place of safe discharge Install your air bleed connection into the 90 elbow mounted in the top tapping behind the smoke collector box Inst...

Страница 7: ...t from a broken or leaking radiator or pipe or a cracked section in the boiler SEQUENCE OF OPERATION Forced Circulation Hot Water System with Tank less Heater When the room temperature falls below the...

Страница 8: ...ith the On Time pre set at 2 minutes and the Cycle Time set at 16 minutes the unit would come on feed corn for 2 minutes and not feed corn for 14 minutes This gives you a complete cycle time of 16 min...

Страница 9: ...temperature exceeds 95 C 200 F in a furnace supply plenum on hot air furnaces the automatic fuel feed is interrupted f Check that if there is a failure of the fan providing combustion air the automat...

Страница 10: ...r regulator or mechanical vent I 6 ft 182 cm To service regulator vent outlet J 3 ft 91 cm From any forced air intake of other appliance K 48 in 122 cm Clearance to non mechanical air supply inlet to...

Страница 11: ...high temperature silicone Class PL connector should maintain a pitch on rise from the furnace to the chimney of at least per foot A LISTED 4 STAINLESS STEEL LINER MUST BE USED IN MASONRY CHIMNEYS You...

Страница 12: ...DAMPER IN THE EXHAUST VENTING SYSTEM OF THIS UNIT and DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE BOILER DAMPER CONTROLS Damper operation The damper is a plate that helps cont...

Страница 13: ...ent immediately 2 Alert others in the house to evacuate 3 Close the appliance s dampers and or the primary air inlet controls limiting the fire s air supply and reducing its intensity 4 Open the appli...

Страница 14: ...13 Figure 3...

Страница 15: ...upply side exiting the domestic water coil see figure 5 Drain valve piping should be piped to a safe area for discharge Failure to install pressure temperature relief value will void boiler warranty P...

Страница 16: ...15 Figure 5...

Страница 17: ...16 Figure 6...

Страница 18: ...ustion air in order to completely and efficiently burn its fuel If an ample supply is not available erratic operation noise combustion and fuel odours in the air may result REMEMBER THAT VENTING FANS...

Страница 19: ...GND Pimary Control L1 L2 N H B C 2 4 1 3 B B R R W Power Requirements 110 Volts 15 Amps max Wire through a service switch Surge protection required RED RED WHITE BLACK ORANGE RED YELLOW YELLOW WHITE...

Страница 20: ...When burning corn the primary combustion takes place on a fluidized bed at the bottom of the fire pot That s why the corn pot has a slide bottom The slide bottom corn pot will need to be cleaned about...

Страница 21: ...350S cycle time switch at 8 minutes and pilot draft switch at Medium Turn on service switch 9 Place two 4 cups of pellets in the bottom of the fire pot Apply a non volatile lighting material on top of...

Страница 22: ...sture Content 8 maximum Heat Content approximately 8200 Btu per pound minimum ASH The ash content of the fuel and operation of your boiler will directly determine the frequency of cleaning The use of...

Страница 23: ...exchanger 8 Re assemble the top of the boiler 9 On a non combustible surface well away from combustible materials have ready a fireproof container with a tight fitting lid to receive ash Open the fir...

Страница 24: ...ll shut down the burner to pilot mode until the water temperature drops below the low limit setting minus the differential setting If the low limit setting is 170 F and the differential is 25 F this m...

Страница 25: ...rkmanship in covered components and that the other terms and conditions of this warranty have been complied with the manufacturer s sole duty and liability under this warranty shall be limited to the...

Страница 26: ...eck for power at the power switch If the meter indicates 115v and the light still doesn t come on replace the control board STEP 3 CONFIRM DRAFT FAN OPERATION Be sure the main power switch is in the D...

Страница 27: ...he boiler INSTALLATION ADJUSTMENT RELATED PROBLEMS PROBLEM Incomplete combustion unburned fuel SOLUTION 1 Adjust air shutter to a more open position 2 Make sure of correct chimney is chimney drafting...

Страница 28: ...ERATOR RELATED PROBLEMS PROBLEM Feed system does not lock in SOLUTION Repeat start up using more fuel PROBLEM Boiler will not start up after power outage SOLUTION Check manual reset on feed system PRO...

Страница 29: ...illow block ball bearing F000505P 9 Manual reset F000105P 3 Cutting blades 2 ea F000513P 2 10 Auger motor F000102P 4 Fuel metering cup F130512P 11 Auger shaft assembly F150293P 5 lovejoy coupling F000...

Страница 30: ...29 NOTES...

Отзывы: