950-0139
7/21/2009
- 7 -
Outdoor unit:
Remove top cover to expose defrost cable.
Hanging Indoor Unit:
o
Once the bracket has been mounted and the power cable(s) fed through
th
e 3” hole from the outside (assuming outside wall installation) gently
bend the stub outward (90° to unit).
o
Feed the power cable through the back into the terminal compartment.
o
Connect defrost cable for MSC49HP13115A, 9H43YGX,
MSC412HP13115A or 12H43YGX.
o
Raise the indoor unit up to the bracket.
o
Place the copper lines, drain hose and power cable
into the 3” hole with
sleeve installed (gray drain hose should be on the bottom of bundle).
o
Hook the top of the indoor unit to the top of the bracket (2 or 3 places) and
once hooked, gently let it swing down and it will snap into the bracket.
Connecting the Line Set:
o
Run the line set between the outdoor unit and the indoor unit using the
supplied (insulated copper tubing).
o
Remove the flare nut plugs from the indoor unit line stubs and remove the
brass covers on the outdoor unit.
o
Install the 1/4
” and 1/2” copper tubing between the indoor and outdoor
unit. Connect to the stub from the indoor unit first.
o
Use 2 wrenches to tighten the connections. Do not over torque.
o
Do not install a liquid line sight glass or filter drier in the system.
o
Once the copper tubing has been connected to the indoor stub start
routing the tubing to the outdoor unit avoid tight bends and kinking the
lines.
o
Avoid connecting 2 or more line sets together, instead use one longer line
set.
o
If line set length is in excess of that required, cut copper line and re-flare
or coil excess vertically to facilitate oil return to the compressor.
o
If copper tubing is cut and re-flared make sure there is no debris or
contaminate left in tubing.
Содержание SeaBreeze 12A23YGX
Страница 10: ...950 0139 7 21 2009 10 WIRING DIAGRAMS...