2
441 01 2613 05
Specifications are subject to change without notice
START
!
UP CHECK SHEET
For 80+ Furnace
(This sheet is optional. Keep this page for future reference.)
Date of Start
!
Up:
Dealer Name
:
Address
:
City, State(Province), Zip or Postal Code
:
Phone
:
Owner Name
:
Address
:
City, State(Province), Zip or Postal Code
:
Model Number:
Serial Number:
Setup Checks
Check the box when task is complete
Thermostat: Heat Cooling Fan
Subbase level:
Anticipator Set: Setting of Anticipator
____
All Electrical Connections Tight:
Supply voltage:
____
Blower Motor H.P.:
____
Fan “Time ON” setting: ____ Fan “Time OFF” Setting ___
Manual Gas Shut
!
Off Upstream of Furnace/Drip
!
Leg?
Gas Valve turned ON?
Type of Gas: Natural:
Propane:
Filter Type and Size:
Calculated Firing Rate:(See
Checks and Adjustments
Section).
Heating Check
Measured Line Pressure when Firing Unit:
Measured Manifold Gas Pressure:
Temperature of Supply Air:
(
°
)
Temperature of Return Air:
(
°
)
Temperature Rise (supply
!
return temperature): (
°
)
In Rise (see furnace rating plate)?
(
°
)
Static Pressure (Ducts): Supply Air Return
Blower speed tap used for heating
Limit Opens: (
°
)
Limit Closes: (
°
)
Optional Check: CO ? CO2 ?
Cooling Check
Temperature of Supply Air:
(
°
)
Temperature of Return Air:
(
°
)
Temperature Difference:
(
°
)
Static Pressure (Ducts) cooling: Supply Air Return
Blower Speed Tap used for cooling:
_______
Dealer Comments:
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.