background image

4

3. COMPONENT OPERATION

3.1. AX Pump Operation

The Interlube AX range has been designed to provide
reliable and virtually maintenance free service in the
most demanding applications. The system
comprises an electrically operated 110/240 V pump
with integral controller, and a loom of tubing which
connects each bearing directly to its own respective
pumping unit. Each bearing is fed independently,
meaning that points can be individually calibrated,
and also damage to one line does not affect the rest
of the system. The pumps come in two variations;
the AX1 and AX2 which have 1 & 2 litre top fill
reservoirs and have the motor and controller housed
in the lid, and the AX3 which has a 3 litre reservoir
and has the motor and controller housed in the base.
The motor drives the impellor, which draws grease
into the pumping chamber and also gives a visual
indication of cam rotation. It also drives the cam,
which operates the individual pumping units, and
feeds grease into the tubing. The pumps can operate
with a wide range of lubricants from SAE 80 oil up
to and including NLGI grade 2 grease.

The reservoir paddle (10) is also rotated by the cam
assembly. Paddle (10) rotation ensures positive
lubricant flow to the lubricant injectors.

Each lubricant injector is actuated by its cam (17)
only once per 360

o

revolution.

3.1.1.  Filling The Reservoir

Depending on the application, consult with your
lubricant vendor or the authorised Interlube
distributor for a lubricant suitable for the
application. Refer to TECHNICAL DATA  for a
guide to lubricant selection.

The initial reservoir fill must be through the grease
nipple (22) or quick coupling (27) on the pump
body (21). This is to ensure against any air pockets
in the reservoir.

NOTE

Be certain to wipe the nipple (22) clean 

before filling. Place the dirt cap back on the 

lubricant nipple (22) after any service procedures.

The AX reservoir  (12)  is filled either through the
grease nipple (22) or the Quick Connector (27).

The cam assembly consists of one  or more cams
(17) in an offset  configuration, with each cam (17)
dedicated to a row of lubricant injectors. As the cam
assembly rotates, the cam lobe actuates the injectors
and lubricant is dispensed.

Subsequent refilling of the reservoir (12) should be
done through the grease nipple (22) or quick
coupling (27 ) to minimise any contaminates from
entering the reservoir.

CAUTION

Do not overfill the reservoir (12). Fill only to 

Max Level label (28).

AX1 & 2 CAUTION

If the reservoir (12) must be filled through the

reservoir cap moulding (5),  be certain the cap (1)

is secured to the reservoir cap moulding (5) when

finished. Take care to prevent air pockets in 

the reservoir.

CAUTION

Stored lubricants must be sealed and properly 

kept to remain free of contaminates.

3.2. Programming the AX

AX 1 & 2 Cycle settings are selected through the 4
Dip Switches located on the circuit board (30), inside of
the motor housing assembly (38).

Switch Position

Cycle Time

1

2

3

4

1

2

3

4

6 minutes

15 minutes

30 minutes

60 minutes

ON

--

--

--

--

ON

--

--

--

--

ON

--

--

--

--

ON

Содержание AX1

Страница 1: ...xx AX1 2 3 SERVICE MAINTENANCE MANUAL SERVICE and MAINTENANCE MANUAL for INTERLUBE INDUSTRIAL LUBRICATION SYSTEM ...

Страница 2: ... TECHNICAL DATA 6 5 RECOMMENDED PREVENTIVE 6 MAINTENANCE 5 1 Inspection Procedures 7 6 TROUBLESHOOTING 8 7 SERVICE PROCEDURES 12 7 1 Lid Assembly Replacement AX1 2 12 7 2 Reservoir Paddle Replacement AX1 2 12 7 3 Reservoir Replacement AX1 2 12 7 4 Wiring Diagrams 13 7 5 Replacement of Motor Assy AX1 2 15 7 6 Replacement of PCB Assy AX1 2 15 7 7 Replacement of Cam Assy AX1 2 15 7 8 AX3 Reservoir As...

Страница 3: ...eservoir paddle 10 The number is the reference used in section 7 Figures 3 4 Six different lubricant injector output capacities are available to match the lube point volume requirements Lubricant injectors are colour coded for easy identification Unused pump manifold ports are plugged The AX pump is equipped with one or more cams 17 that operate the lubricant injectors as the cams s are rotated by...

Страница 4: ... lubricant vendor or the authorised Interlube distributor for a lubricant suitable for the application Refer to TECHNICAL DATA for a guide to lubricant selection The initial reservoir fill must be through the grease nipple 22 or quick coupling 27 on the pump body 21 This is to ensure against any air pockets in the reservoir NOTE Be certain to wipe the nipple 22 clean before filling Place the dirt ...

Страница 5: ... a 4 position switch that can be changed using a small screw driver On AX3 a 10 position rotary switch 30 is used for programming Switch Position Cycle Time 0 1 2 3 4 5 6 7 8 9 Continuous 1 2RPM 3 minute delay 7 minute delay 10 minute delay 20 minute delay 30 minute delay 45 minute delay 60 minute delay 90 minute delay 120 minute delay Lubricant injector capacity and cycle time setting determine t...

Страница 6: ...is a colour coded ring on the injector for ease of identifying output capacity Red 0 010 cc 78033 Green 0 015 cc 78034 Yellow 0 025 cc 78035 Blue 0 040 cc 78036 Grey 0 060 cc 78037 Black 0 100 cc 78038 Blanking Plug 34237 402 Collet Colour Coded Ring Valve Seal Priming Port Return Spring Check Valve Spring Check Valve Piston Lube Chamber Lube Piston Part Number 4 0 Technical Data LUBRICANT NLGI Gr...

Страница 7: ...d fittings C Check all lubrication lines make certain that there are not any breaks Check for wear or chaffing that may lead to leakage D Check pump operation using Manual Override on AX3 29 Indication Light Manual Override button 29 Manual Override AC3 CAUTION To ensure proper operation of the lubrication system fill the reservoir 12 only with clean lubricant 5 0 Recommended Preventative Maintena...

Страница 8: ...injector 4 Injectors have been switched 4 Check the lube schematic or installation record making sure the correct injector is supplying the lube point C All lubrication points are 1 Time between lube cycles is 1 Adjust pump CYCLE TIME over lubricated too short setting D One or more lubrication points 1 Injector s is oversized 1 Replace the injector s with a are over lubricated smaller capacity inj...

Страница 9: ...fy which injector frees the system Replace the injector Check for contaminates in the reservoir Replace the lubricant if contaminates are found H Inoperative injector but the 1 Return spring on the injector is 1 Secure the return spring to the pump is able to operate not attached lube piston and injector body 2 Lube piston is missing 2 Replace the injector 3 Outlet check valve is not 3 Remove and ...

Страница 10: ...10 1 5 6 28 38 12 39 42 10 18 17 32 22 34 36 35 20 21 14 13 37 33 15 40 31 30 41 7 FIG 3 Connector 2 Screws O Ring O Ring Camshaft Blank Plug AX1 2 ...

Страница 11: ...11 FIG 4 12 42 48 10 18 18 17 43 2 21 3 46 45 44 47 27 7 30 8 29 O Ring Camshaft 28 AX3 ...

Страница 12: ... screwdriver to remove the three pan head screws 6 from the reservoir lid 5 7 1 2 Remove the lid assembly from the reservoir 12 Make certain the O ring 7 is removed and discarded 7 1 3 Carefully remove any old lubricant from the upper lip of the reservoir 12 7 1 4 Place the new O ring 7 in the lid 5 7 1 5 Place the lid assembly on the reservoir 12 and align the mounting holes 7 1 6 Install the thr...

Страница 13: ... reservoir 12 Align the mounting holes WIRING DETAILS 7 3 8 Carefully install the reservoir bracket O ring 12 15 20 onto the carcass ring 21 Align the mounting holes of all three pieces 7 3 9 Install the six new washers 14 and screws 13 Torque to 6 Lb In 0 7Nm Do not over tighten the screws 13 7 3 10 Refer to 7 2 above and install the reservoir paddle assembly 7 3 11 Refer to 7 1 above and install...

Страница 14: ...14 AX3 WIRING DIAGRAM Control Board RED VE BLUE VE YELLOW GREEN EARTH RED LED1 VE GREY LED1 VE BLACK M O BLACK M O Manual Override LED ASSY EARTH LEAD Pump must be earthed and fused 110V 1A 240V 1A ...

Страница 15: ... existing PCB Insert new one having first reset switch to original positions 7 6 4 Reconnect wires as in 7 6 2 7 6 5 See 7 1 for reassembly of motor housing 7 7 Cam Assembly Replacement AX1 2 7 7 1 Refer to 7 1 above and remove the reservoir lid assembly Remove the lubricant from the reservoir 12 7 7 2 Refer to 7 2 above and remove the paddle assembly 10 7 7 3 Remove the bottom cover 34 by removin...

Страница 16: ...housing 45 to the motor cover 44 7 10 2 Pull the motor housing 45 away from the cover 44 and dispose of the old O ring 46 7 10 3 Disconnect the motor molex connector from the PCB Put the motor housing assembly aside 7 10 4 Loosen the two screws that hold the retaining plate 48 over the motor 42 7 10 5 Remove the motor and place the new one in position ensuring the motor drive shaft fits into the c...

Страница 17: ... grades up to 000 grade only AX2 PUMP MOUNTING CENTRES AX3 PUMP MOUNTING CENTRES 8 5 25 25 50 140 65 45 4x 6 5 120 Ordering Method AX2 X X X 1 6 Mins 2 15 Mins 3 30 Mins 4 60 Mins 1 110V 2 240V 1 12 POINTS 2 24 POINTS 3 36 POINTS Ordering Method AX3 XXXX 0 Continuous 1 3 Minute delay 2 7 Minute delay 3 10 Minute delay 4 20 Minute delay 5 30 Minute delay 6 45 Minute delay 7 60 Minute delay 8 90 Min...

Страница 18: ... AC SP6 AC SP10 ADAPTOR 8 CAMSHAFT 12 UNIT AX SP5 1 24 UNIT AX SP5 2 36 UNIT AX SP5 3 AX1 AX2 SPARES REF NUMBER ITEM ITEM No 1 PCB ASSY AX3 SP2 110V AX3 SP2 110V 2 ELECTRIC AX3 SP8 110v MOTOR AX3 SP8 240v 3 RESERVOIR AX3 SP9 4 BRACKET 38580 126 5 PADDLE AC3 SP7 ASSY 6 CAMSHAFT ASSY 12 UNIT AX3 SP5 1 24 UNIT AX3 SP5 2 36 UNIT AX3 SP5 3 48 UNIT AX3 SP5 4 60 UNIT AX3 SP5 5 7 MOTOR AX3 SP10 110V COVER...

Страница 19: ...y 40 C 125cSt Drop Point 185 C Food Grade Colour White NLGI 2 Penetration 265 295 Base Viscosity 40 C 410cSt STRAIGHT CONNECTORS ELBOW CONNECTORS GREASE LOOMING ACCESSORIES Plastic tape 1 Black 1755 830 Spiral Binding 1 2 lines 1837 001 Spiral Binding 8mm I D 3 4 lines 1837 002 Spiral Binding 10mm I D 5 7 lines 1837 003 Spiral Binding 14mm I D 8 12 lines 1837 004 ACCESSORIES ACCESSORIES 152823 25 ...

Страница 20: ...ricated Col Code Cal cc 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 Unit No Bearing Lubricated Col Code Cal cc MULTI LINE INSTALLATION RECORD PUMP CALIBRATION SYSTEM Machine Customer Pump No Voltage Timer Settings Installed by Date AX1 AX2 AX3 SYSTEM TYPE ...

Отзывы: