FINAL ADJUSTMENTS AND SETTINGS
Lift Gate Serial #
1.
Remove the three plugs for the foot switch and warning lights from out of the
platform, connect with the plugs coming from the lift arm (yellow with yellow, black
with black, and the plugs identified by cable binders), and relocate the plugs, all
wired tied together. Push all connections into the platform and remount the pull-
relief.
2.
Close platform to vehicle body.
3.
All attached cables must be carefully laid and securely fastened. The cables must be
sufficiently flexible.
4.
Lower the platform until it is about 10 inches above the ground. Set switch b-13 on
the right-hand torsion lift arm so that it is positioned horizontally. Undo the bolt and
retighten it after setting. Bend the aluminum tab by the mercury switch to secure it
from loosening.
5.
Raise, lower, open and close the platform several times in order to ventilate the
cylinders.
6.
Check the oil level with the platform lowered.
7.
Make sure the Cab switch is working properly, LED’s turn off when gate is closed
and stay on if the lift is switched off with the platform open. Platform lights turn off.
8.
Make sure all grease zerks are installed
9.
Make sure tilt cylinder lock nuts are tightened.
Содержание ILF Series
Страница 15: ......