6.
When the platform is in the correct position in relation to truck sill, it is time to finish
welding of mount tube.
Make sure to have power pack pulled out when welding
the tube.
7.
Weld tube and mount plates with a
1/4” fillet weld 100%
of the area around mount
tube and around frame on both sides of plates. The plates must have a minimum of
8” of overlap
on the frame.
INSTALLATION & OPERATION OF FOOT CONTROL
Make sure that connections are wire tied together and pushed inside the platform.
DOWN:
Step on switch 1 and hold – wait between one and
three seconds before you step on switch 2.
UP:
Step on switch 2 and hold – wait between one and
three seconds before you step on switch 1. The
platform will tilt up to preset position before raising.
IF BOTH SWITCHES ARE NOT ACTIVATED
WITHIN THREE SECONDS, START OVER
.
Содержание ILF Series
Страница 15: ......