INSTALLATION & OPERATION OF HAND CONTROL
BUTTON NO. 1 – UP
BUTTON NO. 2 + 1 – TILT UP
BUTTON NO. 2 – TILT
BUTTON NO. 2 + 3 – TILT DOWN
BUTTON NO. 3 – DOWN
For the Installation of hand control, take the harness that is attached to the side control
box. Connect all wires together according to cable ID’s. Use heat-shrink to seal the
connection.
2 Button Hand Control
3 Button Hand Control
Up -
5
- Red
Up -
5
- Yellow
Down -
6
- Yellow
Down -
6
- Orange
12V Hot -
4
- Green
12V Hot -
4
- Red
Tilt-Up -
3
- Blue
Tilt-Down -
14
- White
Existing Wire on Gate:
1.
Find hot wire & touch hot wire to other wires.
2.
Note function and match to above.
Содержание ILF Series
Страница 15: ......