![Intercoax ECP-2808RM Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/intercoax/ecp-2808rm/ecp-2808rm_user-manual_2076217010.webp)
Hardware Installation — 10
2.4.2.1. Rackmount Bracket Installation Guide
1. Remove the 3 of factory installed screws from both sides of managed switch and keep these screws as they will
be used to attach the new rack mount brackets. (See Picture 1 & 2)
Picture 1
Picture 2
2. Using these screws, attach the supplied rackmount bracket to the managed switch (Carefully check LEFT and
RIGHT side brackets, see pictures 3 & 4).
Picture 3
Picture 4
2.4.2.2. Rack Mount Instructions
1.
Elevated Operating Ambient
- If installed in a closed or multi-unit rack assembly, the operating ambient
temperature of the rack environment may be greater than room ambient.
Therefore, consideration should be given to installing the equipment in an environment compatible with the
maximum ambient temperature (Tma) specified by the manufacturer.
2.
Reduced Air Flow
- Installation of the equipment in a rack should be such that the amount of airflow required
for safe operation of the equipment is not compromised.
3.
Mechanical Loading
- Mounting of the equipment in the rack should be such that a hazardous condition is not
achieved due to uneven mechanical loading.
4.
Circuit Overloading
- Consideration should be given to the connection of the equipment to the supply circuit
and the effect that overloading of the circuits might have on overcurrent protection and supply wiring.