- 8 -
8
Assembly into receiver in Top Section. Using 3/8”x2” bolts provided in
Hardware Set #3, push bolt thru 3/8” lock washer, thru 3/8” flat washer,
thru pre -drilled hole in PVC pipe, and into pre -inserted nut in the receiver in
Top Section. Make sure orientation of Top Section is such that Handrail will
connect to both Top Section and Step Section. Tighten connections slightly.
Connect Handrail to the Top Section of the slide and to steps before
attaching the Top Section to the Upper Flume. Note: Handrails must be
installed with X-stream label out. Use the 5/16” bolts x required length (see
Schedule Two) and washers from Hardware set #5 to connect the Top
Section to insert nuts in the Handrail. A rachet extension will be required
for bolts through flange of Top Section. Push bolt thru Lock washer, thru
flat washers, thru hole provided in Top Section or Steps, into pre -inserted
nuts in handrail, and tighten all these connections. The Ladder Step Support
Sub Assembly is now complete.
Bolts Required for Each Handrail (2 Handrails)
1. (1) 5/16” x 1-1/4” hex head zinc bolt
2. (1) 5/16” x 2-1/2” hex head zinc bolt
3. (1) 5/16” x 1-1/2” hex head zinc bolt
4. (1) 5/16” x 1-1/2” hex head zinc bolt
5. (1) 5/16” x 2” hex head zinc bolt
6. (1) 5/16” x 2” hex head zinc bolt
Schedule Two: Handrail Hardware
Содержание X-stream
Страница 1: ...www inter fab com X stream Slide Assembly and Installation Instructions...
Страница 3: ...3 3 A 1...
Страница 4: ...4 4 A 2...
Страница 5: ...5 5 Fig A 3...