- 10 -
10
Step Three: Main Slide Assembly
(Note: This section may be assembled on the ground, with parts upside down
or on their sides).
•
Connect Lower Flume Section to Upper flume Section, using 3/8” x 2-3/4”
thru bolts in four locations, ensuring a flexible gasket is in place (installed at
factory) (Fig. 5) Use Hardware Set #2. Push 3/8” bolt thru lock washer, thru
flat washer, thru pre -drilled holes in flanges of both flumes, thru flat washer,
thru 3/8” nuts. IMPORTANT NOTE: There is enough tolerance in the
flange connections to provide a smooth and even transition between flumes
on the sliding surface of the slide; usually, it will take the efforts of two
persons to ensure this: one to pull or push up or down on either of the two
flumes at the flange connection, and one to tighten the bolts when the top
surfaces are even. It is recommended that the two center bolts be tightened
first when this is done, and that the two outer connections be tightened when
the sides are aligned, in a similar manner to the center ones. Tighten all
connections. NOTE: Make sure AB/CD or CD/AB orientation is correct
for Left or Right Hand slide as required (see note, Fig. B).
Fig. 5
Connect exit section to lower flume, using 3/8” x 2-3/4” thru bolts in four
locations (ensuring a flexible gasket has been installed by Mfr. in recess
provided for that purpose). Push 3/8” bolt thru lock washer, thru flat
washer, thru pre -drilled holes provided in both flanges, thru flat washers,
thru 3/8” nut (Fig. 6). IMPORTANT NOTE above applies here also! Use
Hardware Set #2. Tighten all connections.
Fig. 6
Gasket
Содержание X-stream
Страница 1: ...www inter fab com X stream Slide Assembly and Installation Instructions...
Страница 3: ...3 3 A 1...
Страница 4: ...4 4 A 2...
Страница 5: ...5 5 Fig A 3...