Step Five: Anchoring to Deck

• 

Position all foot receivers on deck in the correct location, checking to insure 
the legs are vertical, then carefully mark the locations of all anchor bolts. If
proper care is exercised, drilling of  leg anchor bolt holes may be done with 
leg foot receivers in position; in this case, mark the location of holes for the 
slanted Step Support anchor bolts before moving slide aside (holes may not 
be easily drilled with this piece in position due to interference with the steps).

• 

Move the slide aside, if necessary, to drill the slanted Step Support anchor 
bolt holes.

• 

Install Anchor Bolts at correct locations. Anchor bolt thread must protrude 
1-1/2 inches above the deck. Use Hardware Set #4.

• 

Install foot receivers onto deck on anchor bolts previously installed.  (Fig. 10)

• 

Tighten all connections.

Fig. 10

16 degree slope
from vertical

Anchor Bolts must extend 
1-1/2” above deck.  Holes 
may be drilled in place for 
vertical legs, but for 
slanted column, may be 
marked, and drilled after 
slide is moved slightly to 
the side.

Содержание X-stream

Страница 1: ...www inter fab com X stream Slide Assembly and Installation Instructions...

Страница 2: ...ded that the slide not be permanently anchored to deck until the proper time in the assembly order Choose the Water Stub up Location and Footprint Template for the the applicable X stream slide from t...

Страница 3: ...3 3 A 1...

Страница 4: ...4 4 A 2...

Страница 5: ...5 5 Fig A 3...

Страница 6: ...g leg Short leg shown with foot installed Handrail 2 Hardware Sets 5 Fig B Parts Required Important Flumes are labeled AB or CD in small letters on flanges For Left Hand Slides Flume AB is upper flume...

Страница 7: ...y using 3 8 x 2 bolts at two locations and 2 1 2 bolt for the location directly underneath the Step Support Assembly Column Push bolt thru 3 8 lock washer thru 3 8 flat washer thru pre drilled holes i...

Страница 8: ...eam label out Use the 5 16 bolts x required length see Schedule Two and washers from Hardware set 5 to connect the Top Section to insert nuts in the Handrail A rachet extension will be required for bo...

Страница 9: ...3 8 flat washer thru pre drilled holes provided in PVC pipe and foot receiver through 3 8 flat washer and thru 3 8 nylon locking nut Note Do not confuse the four Foot receiver holes in PVC pipe with...

Страница 10: ...ll or push up or down on either of the two flumes at the flange connection and one to tighten the bolts when the top surfaces are even It is recommended that the two center bolts be tightened first wh...

Страница 11: ...ction with hardware in Hardware Set 2 ensuring a flexible gasket has been installed by Mfr in recess provided in the flange for that purpose Push 3 8 x 1 3 4 bolt thru lock washer thru flat washer thr...

Страница 12: ...es may not be easily drilled withthis piece in position due to interference with the steps Move the slide aside if necessary to drill the slanted Step Support anchor bolt holes Install Anchor Bolts at...

Страница 13: ...r and glue not included as required Fig 12 Use Hardware Set 6 Fig 12 Step Seven Finish Install all protective caps at exposed bolts Turn water supply on and check water flow Clean Slide and dispose of...

Страница 14: ...plastic polish Novus Inc Mirror Glaze Professional Formula 17 Mirror Bright Polish Co Irvine CA Permatex Plastic Cleaner 403D Permatex Co Kansas City KS J Wax or Kit Automotive Cleaner Waxes S C Johns...

Отзывы: