background image

(This page is intentionally left blank.)

Содержание R2000SC

Страница 1: ...ts If you are not familiar with ESD Electrostatic Discharge procedures used during system integration see the complete ESD procedures described in your Service Guide This guide and other supporting do...

Страница 2: ...This page is intentionally left blank...

Страница 3: ...sor Heatsink s 3 Install Memory Modules 4 Install Hard Drives 5 Install Optical Drive 6 Install the Air Duct 6 Install Add in Card 7 Install Rack Handles 7 Install Intel RAID C600 Upgrade Key optional...

Страница 4: ...supported maximum thermal limits the system must meet the following operating and configuration guidelines Ambient in let temperature cannot exceed 35 C and should not remain at this maximum level for...

Страница 5: ...Swap Hard Drive Bays System Fans CPU1 CPU2 1 1 Redundant Power Supply Modules Server Board Air Duct Optical Drive Bay Optional Front Control Panel Useful Information The system must be configured with...

Страница 6: ...or disconnected or loose cables and components that may have occurred during shipping 2 Remove the Top Cover B Remove the four screws A A B B Slide the cover backward and lift up 3 Remove the Air Duct...

Страница 7: ...e the Processor Protective Cover A A Take the processor out of the box and remove the protective shipping cover A Open the Socket Lever 1 When opening a socket DO NOT TOUCH the gold socket wires 2 Whe...

Страница 8: ...slot Install Memory Modules Continued Memory Con gurations and Population Order Intel Server Board S2400SC For best performance a minimum of three DIMMs per CPU is recommended populated in the blue s...

Страница 9: ...k off the tab on the plastic drive blank Install 2 5 Hard Drive as option Secure the hard disk drive using the four screws for 2 5 HDD 3 5 H D D D D Install the hard disk drive using the same four scr...

Страница 10: ...C Connect the cables as shown O p t i c a l D e v i c e A s s e m b l y B Data Power Optical Drive C 11 Install Add in Card A Remove the screw B Slide the retention device and lift upward A A B Insta...

Страница 11: ...el RMM4 NIC Install Intel RMM4 Lite A Remove the filler Panel and Retention Device refer to STEP 11 B Connect one end of the flex cable to the RMM4 connector on the RMM4 NIC module C Attach the RMM4 m...

Страница 12: ...ce the top cover on system and slide towards the front of the chassis until the recessed front edge is fully engaged Install the three screws at the front and torque to 7 9in lbs Then install the scre...

Страница 13: ...he BIOS setup See the Intel Server Board S2400SC Technical Product Specification for more information Use the instructions provided with the RAID controller and with the operating system With the oper...

Страница 14: ...nt control panel types The features of each are as follows A ID Button with integrated LED B NMI Button C LAN 1 Activity LED D LAN 3 Activity LED E System Cold Reset Button F System Status LED G Power...

Страница 15: ...VGA SerialA SYS FAN_7 CPU 2 Power CPU 2 Fan CPU 1 Power Slot 2 PCI 32 Slot 3 PCI e Gen 2 Slot 4 PCI e Gen 3 Slot 5 PCI e Gen 3 Slot 6 PCI e Gen 3 Front Panel RMM4 NIC Storage Upgrade Key CPU 1 Fan SY...

Страница 16: ...12 Reference System Cabling Diagram R2308SC2SHFN Power Supply One 600w Fixed FAN 1 FAN 2 FAN 3 8 x 3 5 HSBP 0 3 4 7 Optical Drive Front Panel Front Panel USB I2 C...

Страница 17: ...13 Reference System Cabling Diagram R2308SC2SHDR FAN 1 FAN 2 FAN 3 8 x 3 5 HSBP 0 3 4 7 Optical Drive Front Panel Front Panel USB I2 C Power Supply Two 460w CRPS PDB...

Страница 18: ...14 Reference System Cabling Diagram R2312SC2SHGR 12 x 3 5 HSBP Interposer Board FAN 1 FAN 2 FAN 3 Front Panel I2 C Power Supply Two 750w CRPS PDB...

Страница 19: ...This page is intentionally left blank...

Страница 20: ...G71872 002...

Отзывы: