12
The tools required for setting up machines:
200g weight, tools for horizontal install machine position label.
These tools are not included!
UNPACK AND INSPECT.
1. Carefully remove the machine from shipping protection and place it on a straight surface.
2. Inspect the outside of the machine for dents, scratches, or any other damage resulting from
improper transport. If any, please contact your shipping forwarder.
3. Inspect the inside of machine. Observe the location and position of the packing material.
Carefully remove all packing material.
4. Instructions for installing a machine wheel is on next page.
IMPORTANT
If you see any damage when you unpack the machine, file a claim immediately with
the carrier.
VOID YOUR WARRANTY
.
Each machine should have its own electrical circuit, and that circuit should be protected
with a circuit breaker or fuse conforming to local regulations.
Voltages Check
-
Place the test leads with a voltmeter across the LINE (LIVE) and NEUTRAL
terminals of the wall receptacle. The meter should indicate 220 – 240 volts ac , 50 - 60 Hz.
Possible equipment damage could result from improper supply voltage.
Содержание French Fry SARATOGA
Страница 28: ...28...
Страница 29: ...29 NOTES...
Страница 30: ...30 NOTES...
Страница 31: ...31 NOTES...
Страница 32: ...32 French Fry Saratoga Vending Machine Copyright 12 18 Electronics electrics and pneumatic instruction manual...
Страница 37: ...37 Scheme 3 Junction box scheme Scheme 4 Junction box scheme...
Страница 46: ...46 French Fry Saratoga Vending Machine Copyright 12 18 Software and User interface instruction manual...