background image

SAFETY INFORMATION  

Please read the following carefully before starting work on this equipment. 

A competent person should install this appliance in accordance with the installation instructions for 
this appliance and all relevant local and national standards including the following: 
 

-

 

Health & Safety at Work Act 

-

 

IEE Regulations 

-

 

Local & national Building Regulations 

-

 

BS Codes of practice 

-

 

Water Supply Regulations   

-

 

Pressure Equipment Directive  
 

All personnel should be provided with sufficient training in the safe use of this appliance. A warning 
notice displayed next to the machine is often helpful in notifying users that the appliance contains and 
dispenses near boiling water.     
 

 

Inform users that certain surfaces will become hot (especially the draw-off tap). Care should 
be taken to avoid potential injury from burns and scalding whilst operating this appliance.           

 

In line with Health and Safety requirements we recommend a risk assessment be carried out 
after the boiler has been installed.  

 

This appliance is not intended for use by persons (Including Children) with reduced physical, 
sensory or mental capabilities, or lack of experience and knowledge, unless they have been 
given supervision or instruction concerning use of the appliance by a person responsible for 
their  safety. Children should be supervised to ensure they do not play with the appliance 

 

Always disconnect the unit from the power supply before servicing. 

 

The unit must be earthed.  

 

Keep these instructions in a safe place near the unit for future reference  

 

PLEASE NOTE: These units should be insured and inspected annually by a ‘competent person’, 
in-line with the Pressure Equipment Directive. For further information, please contact Instanta 
Technical Dept.   

 
 
 

ENVIRONMENTAL 

(Information on Disposal for Users of Waste Electrical & Electronic Equipment)

  

 

The “crossed out wheelie bin” symbol on this product means that discarded electrical and electronic 
products should not be mixed with general waste. Disposing of the product correctly will help to save 
valuable resources and prevent any potential negative effects on human health and the environment 
which could otherwise arise from inappropriate waste handling. For proper treatment, recovery and 
recycling of end-of-life products, please  contact your dealer or supplier for further information, or 
local authority for details of your nearest designated collection point. 
 

DELIVERY CHECKLIST 

 

Before starting installation, check that you have the following parts; 

 

1.

 

Catering Water Boiler 

2.

 

Drip-tray 

3.

 

White water inlet hose (3/4” BSP connection) 

4.

 

User instructions 
 

Содержание Barista Pro WB-2

Страница 1: ... Pro Range MODELS WB 2 WB 2 6KW Auto Fill Catering Steam Water Boiler INSTALLATION AND USER INSTRUCTIONS INSTANTA LIMITED Canning Road Southport Merseyside PR9 7SN Tel 01704 501114 Fax 01704 501115 IB2 ISS 02 ...

Страница 2: ...ARES SERVICE INFORMATION 7 SERVICE WARNINGS FAULT DIAGNOSTICS 8 GUARANTEE 9 INTRODUCTION Dear Customer Thank you for purchasing this Instanta product Your new water boiler is designed to give you years of trouble free service provided that the instructions contained in this manual are followed All new series Instanta products are energy efficient simple to operate and easy to service Find out more...

Страница 3: ...sion or instruction concerning use of the appliance by a person responsible for their safety Children should be supervised to ensure they do not play with the appliance Always disconnect the unit from the power supply before servicing The unit must be earthed Keep these instructions in a safe place near the unit for future reference PLEASE NOTE These units should be insured and inspected annually ...

Страница 4: ...ese will contaminate the water ELECTRICAL SUPPLY 3 The 3kW model is fitted with a 13amp plug and should be plugged into a suitable socket The 6kW model should be wired into a 30amp switched supply with an ELCB Only a suitable electrician should undertake this work COMMISSIONING 4 Open the steam tap on the left hand side of the unit 5 Switch on using the switch on the front panel The power light wi...

Страница 5: ...l surfaces of the boiler with a damp cloth Do not use abrasive materials on the outer surfaces Wipe the draw off tap each day to keep clean and also prevent lime scale deposits from building up around the tap outlet SERVICE WARNINGS AND FAULT DIAGNOSIS Your boiler is fitted with an intelligent fault diagnosing system and is able to detect various fault conditions Some of these are less serious and...

Страница 6: ...k lime scale or broken probe wire 8 Pressure switch wire has shorted wire A 9 Pressure switch wire has shorted wire B 10 The element s have been trying to heat the water but have failed to do so The element s or control system have failed 11 Water supply is turned off and the low probe has become exposed Probable lime scale build up or water supply problem SERVICE TECHNICAL SUPPORT Tel 01704 50291...

Страница 7: ...ble for problems caused by hard water 2 Dripping Taps These components are subject to wear and tear but in the event of a tap failing within twelve months of installation we will be pleased to replace the tap assembly by post Fitting is very simple and requires no tools An engineer call out is not necessary 3 Accidental damage misuse or use not in accordance with these instructions and damage caus...

Отзывы: