STEP 6
THIS STEP REQUIRES 2 PEOPLE.
Attach Right & Left Handlebars (#8R & 8L) to Main Beam Assembly (#2) Using:
One M12 x 3 5/8” bolt, one 12mm flat washer, one 10mm flat washer and
one locknut. The larger 12mm washer goes on first. Slightly tighten the bolt
and nut.
Attach Right Handlebar (#8R) to Left Handlebar (#8L) Using:
One Connector Plate, four M8 x 3/5” bolts and four flat washers
Note: Fully Wrench tighten all of Step 6 now.
Page 11
02/11
Содержание CDVK2 Power Tower
Страница 6: ...PAGE 4 ...
Страница 17: ...Exploded Diagram PAGE 15 ...
Страница 18: ...DECAL REFERENCE PAGE 16 ...