ASSEMBLY STEPS
STEP 1: Preparing for Assembly
Please read these instructions as this will make your assembly much easier: Two people are needed to
complete assembly. First, open the longer box and remove the upright column. Once you remove the
column, place the Styrofoam back into the box as this will serve as a convenient “platform” to assem-
ble your machine. (See Pic #1 and #2)
STEP 2: Unbox Base Frame and Assemble
Warning: The outer shell of this vibration plate is made of Fiberglass and can scratch easily if mis-
handled. Unbox the main base frame and place on top of the upright column packaging (Pic #1).
Once you place the base frame on top of the column packaging, you may now connect the upright
column to the base frame (Pic #3). By hand, insert (4) #10 washers and M10 nuts. (Pic #4)
05
Содержание G-PLATE 2.0
Страница 1: ...OWNER S MANUAL G PLATE 2 0...
Страница 5: ...FEATURES 03...
Страница 6: ...ASSEMBLY PARTS LIST 04...
Страница 11: ...CONSOLE OPERATION BIG CONSOLE Manual program 09...
Страница 12: ...10 PRE PROGRAM...
Страница 15: ...EXERCISE INSTRUCTIONS 13...
Страница 16: ...14...
Страница 17: ...15...
Страница 18: ...16...
Страница 19: ...17...
Страница 20: ...18...
Страница 21: ...19...
Страница 22: ...20...
Страница 23: ...21...
Страница 24: ...22...
Страница 25: ...23 EXPLODED DRAWING...
Страница 26: ...24 CIRCUIT DIAGRAM...
Страница 27: ...PARTS LIST 25...