background image

   

Doc

#    

E166705  V.1.05         

          

             QS - 4

   MP200

TM

 Metering System Quickstart Guide

Electro 

Industries/GaugeTech

Powered by Innovation™

Service: Three Phase, 4-Wire WYE Service with 3 PT Voltage and 3 CT Connection

for Metering 8 Three Phase Loads - MP200-Y

3

2

I1-LO

LOAD

V2

V1

LINE

N

1

L(+) N(-)

I1-HI

V1

I3-HI

V3

V3

I2-HI

I2-LO

N

V2

N

I3-LO

SERVICES:   WYE, 4 WIRE.

Power Supply
  Connection

CT Shorting Block
     EI# SB-6CT

Only one 3 phase circuit is shown. 
Duplicate for additional circuits.

Earth Ground

Earth Ground

 FUSES
3 x 0.1A

 FUSE 3A

Earth Ground

CONNECTION TYPE: 3PTs, CTs

 IMPORTANT! All CTs must have one side grounded to reduce shock hazard.

 EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed 
 from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com.

Содержание Electro Industries/GaugeTech Shark MP200-S

Страница 1: ...V 1 05 June 19 2020 ...

Страница 2: ...This page intentionally left blank ...

Страница 3: ...ves basic installation wiring and programming instructions For additional meter oper ation and programming information refer to your meter s Installation and Operation Manual and the Communicator PQATM MeterManagerPQATM and EnergyPQA comTM Software User Manual on EIG s website User Manual https www electroind com products shark mp200 multi point high density metering system From the webpage click ...

Страница 4: ...location free from dirt and corrosive substances 1 Mount the unit against any firm flat surface 2 Use a 8 screw in each of the four slots on the flange to ensure that the MP200 unit is installed securely IMPORTANT For safety reasons mount the MP200 unit in an enclosed and protected environment such as in a switchgear cabinet Connect an earth ground to the post on the side of the MP200 unit using a...

Страница 5: ...e while the CT is energized You can order the EI SB 6TC at www electroind com WARNINGS For Electrical Installation All Primary and Secondary circuits can at times produce lethal voltages and currents Avoid contact with any current carrying surfaces The current inputs are only to be connected to external current transfomers CTs I1 LO LOAD V2 V1 LINE N I1 HI V1 I3 HI V3 V3 I2 HI I2 LO V2 N I3 LO SER...

Страница 6: ...2 LO N V2 N I3 LO SERVICES WYE 4 WIRE Power Supply Connection CT Shorting Block EI SB 6CT Only one 3 phase circuit is shown Duplicate for additional circuits Earth Ground Earth Ground FUSES 3 x 0 1A FUSE 3A Earth Ground CONNECTION TYPE 3PTs CTs IMPORTANT All CTs must have one side grounded to reduce shock hazard EIG highly recommends using shorting blocks like the EI SB 6TC so that the meter can b...

Страница 7: ...se Loads MP200 Y IMPORTANT All CTs must have one side grounded to reduce shock hazard I1 LO LOAD V2 V1 LINE I1 HI V1 I3 HI V3 V3 V2 I3 LO SERVICES DELTA 3 WIRE Power Supply Connection CT Shorting Block EI SB 6CT Only one 3 phase circuit is shown Duplicate for additional circuits Earth Ground Earth Ground Earth Ground FUSES 2 x 0 1A FUSE 3A CONNECTION TYPE NO PTs 2 CTs C B A L N Not connected to me...

Страница 8: ...d EIG highly recommends using shorting blocks like the EI SB 6TC so that the meter can be removed from service while the CT is energized You can order the EI SB 6TC at www electroind com I1 LO LOADS VL LINE N 1 L N I1 HI VL I3 HI I2 HI I2 LO N N I3 LO SERVICES SINGLE PHASE 2 WIRE CONNECTION TYPE Direct Voltage CTs Power Supply Connection Only three circuits are shown Duplicate for additional circu...

Страница 9: ...moved from service while the CT is energized You can order the EI SB 6TC at www electroind com I1 LO LOADS VL1 LINE N L N I1 HI VL1 I3 HI I2 HI I2 LO VL2 I3 LO CONNECTION TYPE Direct Voltage CTs To monitor 24 individual loads See accuracy table for limiting factors Power Supply Only one circuit is shown Duplicate for additional circuits Short Voltage inputs together Earth Ground CT Shorting Block ...

Страница 10: ...nload from product CD 3 Click Connect on the tool bar You will see the Connect screen shown on the right Make sure the Address Baud Rate and Protocol settings match the ones shown here 4 Click Connect the Device Status screen confirms the connection click OK to close it The CommunicatorPQATM application s Main screen opens 5 Click the Profile button on the tool bar The Device Profile screen opens ...

Страница 11: ...settings are fixed COM 3 RS485 Address 1 247 Protocol Modbus RTU ASCII Baud Rate 9600 19200 38400 57600 Response Delay 0 750ms NOTE Click the 1 Default to Ethernet or 2 Default to Display button to set either the 1 Ethernet settings for COM1 or 2 Display set tings for COM3 to their default values CT PT Ratios and System Hookup Note that the settings you see on the screen depend on your MP200 unit ...

Страница 12: ...PC s time 3 Click Send Update Device 11 When you have made changes to the meter s Device Profile click Load Profile at the bottom of the Device Profile screen to send the new settings to the meter The meter will reboot and then you can reconnect to it Note that you can also click Save Profile to save your changes without sending them to the meter NOTE For further details and additional programming...

Отзывы: