Metering System Quickstart Guide
Electro
Industries/GaugeTech
™
Powered by Innovation™
Single Phase, 2-Wire Service with Direct Voltage and 3 CT Connection for Metering 24 Single
Phase Loads: MP200-S
IMPORTANT! All CTs must have one side grounded to reduce shock hazard.
EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed
from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com.
I1-LO
LOADS
VL
LINE
N
1
L(+) N(-)
I1-HI
VL
I3-HI
I2-HI
I2-LO
N
N
I3-LO
SERVICES: SINGLE PHASE, 2-WIRE
CONNECTION TYPE: Direct Voltage, CTs
Power Supply
Connection
Only three circuits are shown.
Duplicate for additional circuits.
Short Voltage inputs
together
Earth Ground
CT Shorting Block
EI# SB-6CT
Earth Ground
FUSE 3A