
11
S
I
U
1
2
A
B
C
2.4
2.5
1
2
2
B
A
C
EN
INSTALLATION
Bracket
Bracket anchoring points
Junction line
Hook
Flap in vertical position
Once the holes have been made, place the supplied
plastic sheets inside them.
Roll up the sheet and insert it in the hole, checking that the
A junction line is aiming upwards.
Use a cutter to remove any excess pipe.
To place the external grids, proceed as follows:
-
connect the chains to the ends of the springs;
-
fold the external shutters;
-
insert your arm in the hole to push the shutter outside
while holding the ends of the chains with the other
hand to prevent them from falling down;
-
open the shutter inside the hole;
-
rotate the shutter to bring the flap in the vertical C
position and check that the closing mechanism works;
-
pull the chains by tensioning the springs;
-
use a bolt cutter to remove any excess chain.
-
anchor the hook of the chain to wall B.
Use only the supplied grids or grids with the same
characteristics.
After checking that the bracket is anchored to the wall and
that all necessary electrical connections and condensation
drain predispositions have been made, you can mount the
conditioner. Lift it by the sides of the bottom base until
the bracket fits on all of the right spots on the appliance.
In order to ease the operation, slightly tilt the appliance
towards you.
Direct electrical connections (disconnecting the power
supply cable) and the anchoring of the condensation drain
must be carried out after having spaced the appliance
from the wall using a wooden wedge or any other similar
object.
Once the work is done, check that there are no openings
on the back of the appliance, especially where the air
ducts are connected.
Assembling air ducts and external shutters
Mounting the appliance on the bracket
Содержание 2.0
Страница 18: ...18 S I U EN NOTES ...
Страница 19: ...19 S I U EN NOTES ...