10
S
I
U
1
2
300 mm
3%
1
1
2
2
EN
INSTALLATION
For heat pump appliances, a condensation drain pipe
(Ø10 mm, internal, not supplied) must connect the unit to
the pipe on the top part of the appliance.
A solenoid valve will start the flow of the condensation
from the internal collection tray when the maximum level
has been reached. For cooling only appliances, said pipe
must be connected if the appliance is going to be used
with low external temperatures (below 23°C). As it's a
gravity drain, it is essential for the line to have at least a 3%
slope minimum in every point. A rigid or flexible pump can
be used with a minimum internal diameter of 10 mm. If the
line flows into a sewage system, it is necessary to perform
a siphoning operation before inserting the pipe in the main
drainage. Said siphon must be placed at least 300 mm
under the mouth of the appliance.
If the line flows into a container (e.g. a tank), do not
close the container hermetically and avoid immersing
the draining pipe into the water.
The hole for the condensation pipe must always lean
towards the outside.
The exact position in which to place the pipe mouth is
indicated on the template.
Check that the expelled water does not cause any
damage or problems to people or objects. During
winter, this water may create sheets of ice outside.
When connecting the condensation drain, be careful
not to sqeeze the rubber duct.
It is possible to empty the collection tray using the
safety drain at the base of the appliance if necessary.
Condensation drain predisposition
Safety drain to empty tray
Condensation drain duct