background image

Page 6 of 11 

Edition 07/21/2008 

INNOTECH  

INNOTECH LOCK

 

INNO

TECH

   

LOCK-11

 

 
 

INSTALLATION POSSIBILITIES  INNOTECH LOCK-11: 

 
The basic prerequisite is a static, carrying substructure. 

 

If in doubt consult a structural engineer

 

Attention: the single anchorage point can be plastically deformed! 

 

FASTENING IN CONCRETE 

Concrete quality at least C16/20.

 

 

ATTENTION only fasten receptacle sleeves in structural concrete!  

Do not fasten in screed, levelling concrete, blinding concrete, etc. 
 
ADHESIVE:

 

HILTI HY 150 or FISCHER FIS V360S, or at least 
equivalent.

 

Strictly follow the original instructions provided by 
the adhesive manufacturer!

 

 

 

Bore in 

structural concrete:

 

Diameter: Ø 24 mm, max. Ø 25 mm

 

Depth: min. 110 mm 

(see Fig. on the right) 

 

Clean bore by blowing it out and brushing it. 

 

Bond in INNOTECH LOCK-11 in accordance with the 
instructions for installation and use provided by the 
adhesive manufacturer. 

 

Check for firm seat. 

 

 

If in doubt about the substrate or the fastening, strictly ensure that pull-out tests are 
executed to ensure the strength of the substructure!

 

 

 

Pull-out test:

 

 

The receptacle sleeves are fitted with M10 
female thread for this purpose.

 

Screw the M10 hex bolt at least 15 mm into the 
female thread of the INNOTECH LOCK-11 
receptacle sleeve.

 

The bolt can now be used for the pull-out test. 

 

Test forces in accordance with installation 
recommendation EN 795:1996.

 

(Strictly comply with the instructions for 
installation and use for the test device used)

 

 

 

If the test was performed successfully 
additional receptacle sleeves can be installed 
and tested.

 

The pull-out tests must be documented in the dowel 
log. 

 

Caution: 

Do not use the anchorage device until after the adhesive has cured (see the instructions provided 
with the adhesive). 

Содержание LOCK-13

Страница 1: ...van de veiligheidsinrichting is pas toegestaan nadat de monteur en de gebruiker de originele montage en gebruikershandleiding in de desbetreffende taal gelezen hebben Figyelem MAGYAR A biztons gi bere...

Страница 2: ...NOTECH LOCK 11 13 INSTRUCTIONS FOR INSTALLATION AND USE TABLE OF CONTENTS 1 SAFETY INSTRUCTIONS PAGES 3 4 2 GENERAL INFORMATION PAGE 5 3 INSTALLATION LOCK 11 receptacle sleeve PAGES 6 7 4 APPLICATION...

Страница 3: ...ting the work you must ensure that no objects can fall to the ground from the work site The area below the work site sidewalk etc must be kept clear The fitters must ensure that the ground is suited f...

Страница 4: ...n etc If in doubt relative to safe function of the anchorage point it must be taken out of service and sent to the manufacturer for inspection At least once a year an expert must check the complete sa...

Страница 5: ...oncrete and steel SIGNS AND MARKINGS Type designation INNOTECH LOCK Number s of the applicable standard s EN 795A Name or logo of the manufacturer reseller INNOTECH Manufacturer s serial number and ye...

Страница 6: ...in INNOTECH LOCK 11 in accordance with the instructions for installation and use provided by the adhesive manufacturer Check for firm seat If in doubt about the substrate or the fastening strictly ens...

Страница 7: ...7 21 2008 INNOTECH INNOTECH LOCK INNOTECH LOCK 11 FASTENING ON THE STEEL GIRDER Minimum steel cross section 5 mm Tighten counter nuts Check for firm seat You must contact the manufacturer if there are...

Страница 8: ...keep it depressed Slide the LOCK 13 into the receptacle sleeve until it hits the spring and then release the unlock unlock tab Now press the anchorage point deeper into the receptacle sleeve until an...

Страница 9: ...ety system confirms that the installation work has been executed properly in accordance with the state of the art and in accordance with the manufacturer s instructions for installation and use The sa...

Страница 10: ...e instructions for installation and use inspection logs etc is Overview diagram showing the position of the anchorage devices Draw in the areas where there is a break through hazard The maximum limit...

Страница 11: ...inst falling Inspection in accordance with manufacturer s specifications Expiration date Annual inspection performed Not checked no authorization ANCHORAGE POINT INNOTECH LOCK 13 No deformation The at...

Отзывы: