20
EAP-QUADRAT-10 / Version 170511 / www.innotech.at
EN
17
COPY TEMPLATE
INSPECTION REPORT
INSPECTION REPORT NR.
(PART 2/2)
E A P - Q U A D R A T - 1 0
CONTRACT NUMBER:
PROJECT:
INSPECTION POINTS:
checked and in order!
OBSERVED DEFECTS:
(Description of defect/ Measures to be taken)
VISIBLE PARTS OF THE ANCHOR POINT:
no deformation
no corrosion
firmly positioned
screw fastenings secure
tightening torque of the screw fastenings
mobility of the mounted parts (EAP, SZH, EDLE,...)
HORIZONTAL LIFELINE SYSTEM:
Attention:
For horizontal lifeline systems, the inspection report of the ALLinONE-TYP
instruction manual (see instruction manual for copy template) must be filled out!
Result of acceptance:
The safety system matches the manufacturer's instruction
manual and the latest technological standards. Its safety and reliability is hereby confir
-
med.
Comments:
Name:
Customer
Date, company seal, signature
Date, company seal, signature
Inspection: Contractor (Qualified professional
familiar with the fall protection system)