DIP S1
Settings for use
a. Operational mode
e. Maintenance mode
b. IT power grid
f. TN/TT power grid
c. Terminating resistor ON
g. Terminating resistor OFF
d. Client
h. Host
The typical installation of a standalone charging station (Finland).
Load balancing
The load balancing set up consists of a host charging station unit and up to three client units.
1. Host
2. Client
a. Client 1
b. Client 2
c. Client 3
Wiring for load balancing
The client charger units are connected to the host charger using the right-hand side cable inlet. A rubber grommet is used to
prevent dust and moisture entering the charging station. Before inserting the cables, make a small cut in the grommet for each
cable entering the cable inlet. Recommended cable type for RS-485: ELAQBY/ELAKY 2X2X0,6 or similar.