AFDJ-ADF001A-EN (10 Oct 2014)
3
PowerFlex 7000 “A” or “B” Frame Pre-Commissioning Check List
Please complete (print) this
Pre-Commissioning Check List
and when complete, fax or e-mail to Rockwell and Trane
(contact information provided on preceding page):
1. Receiving and Unpacking
2. Installation / Mounting
Required:
Specify Language for Warning Labels!
_______________________________________________
FROM: _______________________________________
Date: _______________________________________
Name: _______________________________________
Trane Service Company: _________________________
Pages: ______________________________________
Rockwell Regional Fax: _________________________
Trane Regional Fax: ____________________________
Rockwell Regional E-mail: _______________________
Trane Regional E-mail: __________________________
Trane Chiller Serial Number: ______________________________________________________________________
Trane Chiller Sales Order Number: __________________________________________________________________
MV Drive Serial Number: _________________________________________________________________________
Rockwell GMS Service Engineer Requested (YES): _____________________________________________________
Scheduled Commissioning Date
(a)
: _________________________________________________________________
(a)
Important:
The average start-up by Rockwell takes approximately three days to complete.
Rockwell requires four weeks notice to make arrangements.
Initials
Date
The drives have been checked for shipping damage upon receiving.
Check the shock indicator; call Trane Service and Rockwell support to notify if damaged.
After unpacking, the item(s) received are verified against the bill of materials.
Any claims for breakage or damage, whether concealed or obvious, are made to the carrier by
the customer as soon as possible after receipt of shipment. Any claims shall be issued according
to local legislation.
All packing material, wedges, or braces are removed from the drive.
Initials
Date
The drive is securely fastened in an upright position, on a level surface. Seismic zones require
special fastenings; consult Rockwell.
Lifting angles have been removed.
Bolts have been inserted into original location on top of drive (leakage of cooling air).
All contactors and relays have been operated manually to verify free movement.
Install neutral resistors (Frame A only).
PowerFlex 7000 “A” or “B” Frame Pre-Commissioning Check List
Содержание TRANE AFDJ
Страница 20: ...Cabinet 20 AFDJ SVU01D EN Figure 5 A Frame Door swing requirements...
Страница 22: ...Cabinet 22 AFDJ SVU01D EN Figure 7 A Frame Interior view major components in mm...
Страница 26: ...Cabinet 26 AFDJ SVU01D EN Figure 13 B Frame Interior view major components...
Страница 58: ......
Страница 65: ......