![Ingersoll-Rand TRANE AFDJ Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/ingersoll-rand/trane-afdj/trane-afdj_installation-operation-and-maintenance-manual_2059412036.webp)
Pre-Installation
36
AFDJ-SVU01D-EN
Connect the thermistor cable to the connection terminal
assembly (see
Two clear plastic air baffles (to optimize airflow through
the CMC) will be supplied. These mount horizontally and
are placed on top of four white metal baffle supports that
attach around the perimeter of the CMC cabinet (see
). They are secured when the retaining brackets
are placed on top of the baffles and affixed with taptite
screws.
Note:
The rear baffle support must be removed before
installing the CMC.
Figure 35.
Ground cable termination
Figure 36.
Thermistor terminal blocks and connection
cable
1.
Thermistor cable connection
2.
Thermistor terminal assembly
1
2
Figure 37.
Air baffles and mounting assembly (rear
view)
1.
Air baffles
2.
Rear baffle support
3.
Baffle retaining brackets
Figure 38.
Front view of CMC cabinet as shipped (front
barrier plate removed for photograph)
1.
Four CMC power cables
2.
Air baffle retaining brackets (3 of 4 shown)
3.
Two air baffles
1
2
3
1
2
3
Содержание TRANE AFDJ
Страница 20: ...Cabinet 20 AFDJ SVU01D EN Figure 5 A Frame Door swing requirements...
Страница 22: ...Cabinet 22 AFDJ SVU01D EN Figure 7 A Frame Interior view major components in mm...
Страница 26: ...Cabinet 26 AFDJ SVU01D EN Figure 13 B Frame Interior view major components...
Страница 58: ......
Страница 65: ......