![Ingersoll-Rand TRANE AFDJ Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/ingersoll-rand/trane-afdj/trane-afdj_installation-operation-and-maintenance-manual_2059412013.webp)
General Information
AFDJ-SVU01D-EN
13
Scope of Installation and
Commissioning Responsibilities
Table 1.
Scope of installation and commissioning responsibilities
Item Others
Trane
Rockwell
See
Figures/Pages
Chiller (provided by Trane)
X
Inspect chiller for shipping damage
X
Assist if any questions
Drive (provided by Trane from Rockwell)
Direct ship from
Rockwell
Inspect drive for shipping damage
X
Provide drive foundation
X
Uncrate/package drive and inspect
X
Rig drive into place
X
Provide power wires and installation to drive and
terminate:
X
• Line 3-phase voltage to drive; be sure to do this
before fan shroud installation (A-Frame only)
• Fan 3-phase voltage to drive (B-Frame)
• Drive to motor power wiring
• Control power drive to chiller; interconnect (LV)
Install fan shroud boxes
X
Install resistor box
X
Provide adequate ventilation for heat rejection of drive
X
Precommision chiller; refer to chiller IOM forms
X
Fill out drive precommision check sheet
Assist Trane
X
Precommision drive
X
Assist
Apply 120 V
Assist
X
Apply power (3-phase)
Assist
X
Check/Configure drive controls setpoints with Trane
Service Tool
X
Assist
3-phase power (DO NOT APPLY)
Present at start-up
Drive/chiller start-up
Assist
X
Annual inspections
X
X
As specified
Содержание TRANE AFDJ
Страница 20: ...Cabinet 20 AFDJ SVU01D EN Figure 5 A Frame Door swing requirements...
Страница 22: ...Cabinet 22 AFDJ SVU01D EN Figure 7 A Frame Interior view major components in mm...
Страница 26: ...Cabinet 26 AFDJ SVU01D EN Figure 13 B Frame Interior view major components...
Страница 58: ......
Страница 65: ......