B) DEVICE REF. (HORIZONTAL).
PAGE 3
CL
DOOR & HARDWARE PREPARATION
3
1) CHOOSE CORRECT DRILLING TEMPLATES FROM THE CENTER OF THIS BOOK.
2) TAPE DRILLING TEMPLATE ON DOOR USING VERTICAL AND DEVICE REF. (REFER TO ).
C
CL
L
2
VERT C
DEVICE REF C
L
L
RECOMMENDED
HEIGHT 40"
FROM FINISHED
FLOOR
1/8" GAP
DOOR FRAME
1/8" GAP
(3/4" MAX)
FINISHED FLOOR
BOTTOM LATCH
DRILLING TEMPLATE
(F)17-V DEVICE HEAD
DRILLING TEMPLATE
TOP LATCH
DRILLING TEMPLATE
DEVICE
SIDE OF
DOOR
TRIM
SIDE OF
DOOR
DEV
ICE C
L
VERT CL
TOP LATCH
DRILLING TEMPLATE
DEVICE HEAD
DRILLING TEMPLATE
BOTTOM LATCH
DRILLING TEMPLATE
LHR SHOWN
13) APPLY STRIKES AND COVERS.
A) ASSEMBLE CHASSIS COVER TO HEAD ASSEMBLY USING (4) #8-32x1/4" UFPHMS SCREWS.
B) ATTACH END CAP USING (2) #10-24x3/8" PPHMS WITH NYLON PATCH SCREWS.
C) ATTACH LATCH COVERS USING (2) #8-32x1/4" UFPHMS SCREWS.
D) INSTALL STRIKE TO TOP OF DOOR FRAME.
E) INSTALL BOTTOM STRIKE.
PAGE 14
#10-24x3/4" FPHMS OR
#10x1-1/4" FPHSMS (2 QTY)
FOR STRIKE MOUNTING
(SCREWS NOT SHOWN)
#8-32x1/4" UFPHMS
(2 QTY)
#8-32x1/4" UFPHMS
(2 QTY)
#8-32x1/4"
UFPHMS
(4 QTY)
#10-24x3/8" PPHMS
WITH NYLON PATCH
(2 QTY)