Operating the HLD5000
3-1
k
in
a
40
e 0
3
.f
m
te
chn
ica
l ha
nd
boo
k
(1
00
7)
3
Operating the HLD5000
3.1
Start-up
Put the HLD5000 in place (see also chapter wall installation), connect the sniffer line
and the mains cord.
Notice
In the default setting the serial numbers of the main unit and the probe has
to match.
Press the mains switch (
/6) to switch on the HLD5000. The HLD5000 will take
about 30 seconds to warm up as indicated by the display.
In the default setting, the HLD5000 uses English menu text. To switch to another
language press the keys
PROGRAMM
,
OPTIONS
AND
LANGUAGE
. Press the button for
the chosen language and confirm with “OK”.
After the warm-up phase of the HLD5000, an audible signal is produced and the leak
detector will be ready to make measurements. The green LED (
/2) in the
probe indicates that the HLD5000 is ready to make measurements. The type of gas
to which the HLD5000 has been programmed as well as the unit of measurement for
the leak rate (factory default: g/a) is indicated on the display (
/4). Moreover,
the type of probe (detectable gas) to which the HLD5000 has been set up is indicated
on the sticker on the probe.
The main unit is usable for all refrigerants, the detectable refrigerant is determined
by the probe.
Caution
The HLD5000 will only operate after having connected the sniffer line first.
Caution
Do not place the HLD5000 on hot surfaces.
Caution
During warm-up the sniffer tip must not be inserted in the test leak opening.
Otherwise, the internal calibration will be disabled and an error message will be
displayed.
Содержание 510-010
Страница 2: ...0 2 kina40e IVZ fm technical handbook 1007 ...
Страница 8: ...0 8 General Safety Precautions kina40e IVZ fm technical handbook 1007 ...
Страница 40: ...4 12 HLD5000 Settings Menu Structure kina40e 04 fm technical handbook 1007 ...
Страница 48: ...6 6 Maintenance kina40e 06 fm technical handbook 1007 Fig 6 2 Declaration of Conformity ...
Страница 51: ...Appendix A 3 kina40eSIX fm technical handbook 1007 ...