
Incite Hochiki-Securiton Interface Module– Rev 1.0
Page 18 of 21
Install the loop wiring into the CHQ-POM
on the SEC-HIM-35, then slide the unit into
the carrier, making sure that no cables are
pinched.
To install the SEC-HIM-35B, first install mounting
bracket in the second slot and fasten with the Torx
screw provided with the bracket.
Install the loop wiring into the CHQ-SIM on the SEC-
HIM-35, then slide the unit into the carrier, making sure
that no cables are pinched.
Route the interconnection cable in a position where it
can’t get damaged and plug it into the receptacle
provided on the SEC-HIM-35.