![Inciner8 i8-75a Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/inciner8/i8-75a/i8-75a_installation-and-operation-manual_2051113008.webp)
Inciner8 Limited. Company Registered in England & Wales - REG: 04866401
VAT Registration: 855999544
Enter the world of:
www.inciner8.com
+44 (0) 1704 884020
Leading Provider of Thermal Treatment Solutions
Assembly
STEP 1 - Connection of Main Parts
a). Find suitable location for the primary chamber.
b). Attach the stack cap to the chimney using the 4 tech
screws supplied.
c). Using the Fire Cement supplied put a thick beads of
the gasket sealant around the refractory lining on the
outlet of the secondary chamber.
d). Insert chimney and stack cap on the secondary
chamber outlet at securely fasten with 8 M10x20
flanged bolts and nuts.
e). Using the fire cement put a thick bead of sealant
around the outlet of the primary chamber.
f). Lift the secondary chamber on the primary chamber
ensuring the burner mount is facing the same direction
as the primary burner mount.
g). Use the 8 m10x20 flanged bolts and nuts to securely
fasten the secondary chamber to the primary.
h). Attach latch handle with 4 bolts (M8x20)