![Inciner8 i8-75a Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/inciner8/i8-75a/i8-75a_installation-and-operation-manual_2051113011.webp)
Parameter
Inciner8 Limited. Company Registered in England & Wales - REG: 04866401
VAT Registration: 855999544
Enter the world of:
www.inciner8.com
+44 (0) 1704 884020
Leading Provider of Thermal Treatment Solutions
Assembly
STEP 3: Control Panel Model: CE2
Thermocouple.
This is to be screwed into the port
located at the top of the secondary
chamber just beneath the chimney
flange.
Ensure the end of the thermocouple
is centrally located in the chimney
and not touching the concrete.
Electrical connection.
Single phase 10amp connection
required. Connection to be made by
a qualified electrical engineer.
Burner connection port.
Use appropriate burner plugs from
the control panel to connect primary
and secondary burner.
Burner plugs are marked as
PRIMARY (for primary chamber
burner) and SECONDARY (for
secondary or afterburner)
Please remember
All our products are designed to operate on 240v mains supply. Please ensure you use the right voltage when operating
this equipment.
Make sure the control panel has a power supply and follow the instructions for the refractory
curing process.
Choose location for control panel and ensure there is enough cable length to reach each
burner and the thermocouple can reach the thermocouple port.