800-446-7488
34
www.in-situ.com
3. Click
Preferences
.
4. Click
Comm Settings
, and then click the
Port Number
menu.
5. Scroll down to find the correct COM port address. Click the
check mark
to accept
the changes.
6. Click the yellow
Connect
button in the lower right corner to establish a connection
to the instrument.
Performing a Power Cycle (Resetting the Modem) - 1 W Solar
Improperly cycling power may cause electrical issues. Follow the
proper procedure step-by-step to avoid damaging equipment.
Procedures vary by solar panel type.
1. Disconnect the black (negative) lead from the black battery terminal of the TROLL
Link enclosure.
2. Disconnect the white (positive) lead of the solar panel wire from the enclosure
screw terminals.
3. Reconnect the white lead of the solar panel wire to the enclosure terminal labeled
SOL+.
4. Reconnect the black lead to the black battery terminal.
Performing a Power Cycle (Resetting the Modem) - 10 or 20 W Solar
Improperly cycling power may cause electrical issues. Follow the
proper procedure step-by-step to avoid damaging equipment.
Procedures vary by solar panel type.
1. Disconnect the black (negative) leads from the black battery terminals of the
external battery kit enclosure.
2. Disconnect the black lead from the black battery terminal of the TROLL Link
enclosure.
3. Disconnect the white (positive) lead of the solar panel wire from the enclosure
screw terminals.
4. Reconnect the white lead of the solar panel wire to the enclosure terminal labeled
SOL+.
5. Reconnect the black lead to the black battery terminal of the TROLL Link enclosure.
6. Reconnect the black leads to the black battery terminals of the external battery kit
enclosure.
Содержание TROLL 101
Страница 48: ...800 446 7488 48 www in situ com ...