background image

PAGE 13

2

1

Inside 

c:

 Apply silicone sealant down the inside of the ‘long and short sides’ of the  

corner joint.

d:

 Push fit the corner joint cap on to the corner joint.

e:

 

Carefully

 push the ‘short side’ of the corner joint fully onto the main panel. 

A:

 

Aluminium threshold strip

 - Position the strip 

up against

 the corner joint.  

Run a bead of silicone sealant down the length of the threshold strip. Carefully push 
the return panel (the correct way around) into the corner joint (

1

). Slide the return panel 

down the corner joint and into the threshold strip (

2

). Wipe off any excess silicone.

B:

 

Plastic threshold strip

 - Position the strip onto the bottom of the return panel, 

flush with the edge (

1

). Carefully push the panel (the correct way around) into the 

corner joint (

2

) and ensure the strip makes full contact with the floor. 

Options C & D -

 

continued

a

Option a:

 

Drilling floor for foot

 - Use the dimensions above to mark and drill the ‘pin’ hole in the floor. 

Using a 4mm drill bit, carefully drill a shallow hole (no deeper than half the thickness of the tile etc.). 
Use the allen key to adjust the ‘pin’ in the inner foot

*

 to fit into the hole. Position the assembled foot in 

the marked position.

Option b:

 

Sealing foot to floor

 - Use the allen key to remove the ‘pin’ from the inner foot

*

. Apply 

silicone sealant to the underside of the inner foot. Position the assembled foot in the marked position.

b

15

Apply silicone sealant along the bottom of the panels and 

optional foot

, as shown. 

Without threshold strip

 - from outside only, seal along the bottom of the panels, corner joint and wall channel also 50mm up the wall channel and the joints between the wall channel/corner joint and panels. 

Aluminium threshold strip

 - from inside and outside, seal along the bottom and top of the threshold strips. From outside only, seal along the bottom of the corner joint and the wall channel. Also 50mm up the 

wall channel and the joints between the wall channel/corner joint and threshold strips.

Plastic threshold strip

 - from outside only, seal along the bottom of the wall channel and corner joint and 50mm up the wall channel and the joints between the wall channel/corner joint and threshold strips.

Outside -  

Aluminium threshold strip

Outside -  

Plastic threshold strip

Outside -  

Without threshold strip

Outside of foot

Inside of foot

Options C & D -

 

continued

From inside, if required adjust the height of the foot (

1

) so that 

the return panel is vertical. 
Tighten the grub screw (

2

) onto the return panel.

 

Push fit the screw cover caps.

MAIN 

PANEL 

(outside)

c

d

e

2

1

A

B

17 

mm

17 

mm

mm

ø 4

mm

*

2mm

2mm

*

3mm

1

2

Sealant

A

Содержание AQUA SCREEN PURE

Страница 1: ...uture reference Incorrect fitting will invalidate the guarantee SAFETY Handle glass with care Although the glass is very tough sharp impacts can damage both the glass and metal frame Do not remove the...

Страница 2: ...outside of the panel Satin glass patterns MUST be installed to the outside of the panel Note The Glass Guard coating is on the opposite side to the label or satin glass patterns 5 4 If using the thre...

Страница 3: ...6 Remove the panel from the wall channel Carefully trim your chosen threshold strip down to the same width as the panel Measure the height of the threshold strip X and remove the same amount off each...

Страница 4: ...ie bar g From inside tighten the grub screw 1 onto the panel Ensure the panel is vertical and tighten the grub screw in the top of the bracket onto the tie bar 2 Push fit the screw cover cap 10 Push f...

Страница 5: ...he correct way around into the wall channel Note Wetting the edge of the panel with water will help the panel insert If not using the threshold strips proceed straight to step 7 4 If using the thresho...

Страница 6: ...position of the angled tie bar bracket onto the wall Approx 250mm PN80499 PN80499 3mm 2mm 2mm 6 Remove the panel from the wall channel Carefully trim your chosen threshold strip down to the same widt...

Страница 7: ...he grub screw 1 onto the panel Ensure the panel is vertical and tighten the grub screw in the top of the bracket onto the tie bar 2 Push fit the screw cover cap 10 Tighten the large screws on both of...

Страница 8: ...PN10754 Wall channel PN10754 1 Plan position of panels The size of the opening will depend on the tray if used or the site conditions To fit the DOUBLE PANEL WITH ANGLED TIE BARS option follow the sam...

Страница 9: ...ss Guard coating is on the opposite side to the label or satin glass patterns Tie bar PN10786 Wall channel PN10754 Corner joint PN11011 5 4 If using the threshold strip s there are 2 types available A...

Страница 10: ...r joint short side as shown onto the main panel b Carefully measure and trim your chosen threshold strip down to the width of the panel minus the corner joint c Measure the height of the threshold str...

Страница 11: ...Ensure the panel is vertical and tighten the grub screw in the top of the bracket onto the tie bar 2 Push fit the screw cover cap 10 Push fit the top cap onto the top of the wall channel 32 mm a 1 2...

Страница 12: ...oot so it is flush with the underside Place the inner foot into the foot Position the assembled foot under the return panel flush with the edge d Ensure the return panel is vertical and if required ad...

Страница 13: ...ling foot to floor Use the allen key to remove the pin from the inner foot Apply silicone sealant to the underside of the inner foot Position the assembled foot in the marked position b 15 Apply silic...

Страница 14: ...e wall b If required trim the tie bars to length X 50mm c Assemble the tie bars slide on the top panel brackets and tie bar brackets Lightly tighten the fitted grub screws X Wall Opening X 50mm a b c...

Страница 15: ...e tie bars 2 Push fit the screw cover caps 32 mm a c d b 2mm 1 2 g Inside 3mm 5 a Carefully place the tie bar assemblies onto the glass approximately 100mm from the edges depending on your installatio...

Страница 16: ...el c Use the 3mm allen key to wind up the pin on each inner foot so they are flush with the underside Place the inner feet into the feet Position the assembled feet under the return panels flush with...

Страница 17: ...hole Position the assembled feet in the marked position Option b Sealing feet to floor Use the allen key to remove the pins from the inner feet Apply silicone sealant to the underside of the inner fee...

Страница 18: ...nel with water will help the panel insert 6 mm a b d 32 mm 1180mm max c PN80499 PN80499 PN80506 5 4 Ensure that the open end of the panel is vertical and the panel is parallel with the opposite wall W...

Страница 19: ...ten the large screws on both tie bar brackets 7 Push fit the top cap onto the top of the wall channel 32 mm a 1 2 c d g Inside b 3mm 2mm 8 Foot Options Option A Without foot follow step 10 Option B Wi...

Страница 20: ...contains materials such as aluminium and glass which can be recycled Please contact your local authority to find your nearest recycling centre TECHNICAL HELPLINE 01460 258682 PAGE 20 10 Seal along th...

Отзывы: