STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it with
an Axle (#14), two M10 x ¾” Allen Bolts (#30), and two
∅
¾” Washers (#36).
B.) Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two
Foam Tubes halfway through the holes on the Leg Developer (#5). Push six Foam Rolls
(#19) onto the Tubes from both ends. Plug six Foam Roll End Caps (#20) into the Tubes.
C.) Slide the Olympic Sleeve (#16) onto the weight post on the Leg Developer and secure it
with one M8 x ½” Allen Bolt (#39). Attach a Spring Clip (#17) to the Sleeve.
D.) Attach the Bar Holder (#40) to the Leg Developer and secure it with a L-shaped Lock Pin
(#41). Remove the Pin and Bar Holder when doing Leg Exercise.
DIAGRAM 4
24
Содержание Powerhouse Elite PHE 9000
Страница 4: ...SMITH MACHINE HARDEWARE PACK 3...
Страница 5: ...SMITH MACHINE HARDEWARE PACK 4...
Страница 6: ...SMITH MACHINE HARDEWARE PACK 5...
Страница 9: ...DIAGRAM2 8...
Страница 13: ...CABLE LOOP DIAGRAM 12...
Страница 15: ...DIAGRAM 6 14...
Страница 19: ...18...
Страница 21: ...MULTI PURPOSE BENCH HARDWARE PACK 20...
Страница 27: ...26...