STEP 5 (See Diagram 5)
A.) Attach the Arm Curl Pad (#13) to the Arm Curl Stand (#4). Secure it with two M8 x 5/8”
Allen Bolts (#35) and two
∅
5/8” Washers (#37). Insert the Arm Curl Stand into the front
opening on the Main Frame (#1). Use the Lock Knob to hold the desired Arm Curl height.
B.) The Leg Developer can be locked when doing Sit Up exercises. Simply pull the U-shaped
Pin out and drop into the hole on the Leg Developer. Remove the Pin when doing Leg
Developer exercises.
DIAGRAM 5
25
Содержание Powerhouse Elite PHE 9000
Страница 4: ...SMITH MACHINE HARDEWARE PACK 3...
Страница 5: ...SMITH MACHINE HARDEWARE PACK 4...
Страница 6: ...SMITH MACHINE HARDEWARE PACK 5...
Страница 9: ...DIAGRAM2 8...
Страница 13: ...CABLE LOOP DIAGRAM 12...
Страница 15: ...DIAGRAM 6 14...
Страница 19: ...18...
Страница 21: ...MULTI PURPOSE BENCH HARDWARE PACK 20...
Страница 27: ...26...