background image

7

CAVO 

ALIMENTAZIONE

1-3

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

1.4  GAS CONNECTION.

Our boilers are designed to operate with methane 

gas (G20) and LPG. Supply pipes must be the 

same as or larger than the 1/2”G boiler fitting. 

Before connecting the gas line, carefully clean 

inside all the fuel feed system pipes to remove 

any residue that could impair boiler efficiency.  

Also make sure the gas corresponds to that for 

which the boiler is prepared (see boiler data 

name plate). If different, the appliance must 

be converted for operation with the other type 

of gas (see converting appliance for other gas 

types). The dynamic gas supply (methane or 

LPG) pressure must also be checked accord-

ing to the type used in the boiler, which must 

comply with the technical standards in force, as 

insufficient levels can reduce generator output 

and cause malfunctions. Ensure correct gas cock 

connection. The gas supply pipe must be suitably 

dimensioned according to current regulations 

in order to guarantee correct gas flow rate to the 

burner even in conditions of maximum genera-

tor output and to guarantee appliance efficiency 

(technical specifications). The coupling system 

must conform to technical standards in force.

Fuel gas quality.

 The appliance was designed 

to operate with combustible gas free of impuri-

ties; otherwise it is advisable to fit special filters 

upstream of the appliance to restore the purity 

of the fuel.

Storage tanks (in case of supply from LPG 

depot).

- New LPG storage tanks may contain residual 

inert gases (nitrogen) that degrade the mixture 

delivered to the appliance casing functioning 

anomalies.

- Due to the composition of the LPG mixture, 

layering of the mixture components may occur 

during the period of storage in the tanks. This 

can cause a variation in the heating power of 

the mixture delivered to the appliance, with 

subsequent change in its performance.

1.5  HYDRAULIC CONNECTION.

Attention:

 in order not to void the condensa-

tion module warranty, before making the boiler 

connections, carefully wash the heating system 

(pipes, radiators, etc.) with special pickling or 

descaling products to remove any deposits that 

could compromise correct boiler operation.
A chemical treatment of the thermal system wa-

ter is required, in compliance with the technical 

standards in force, in order to protect the system 

and the appliance from deposits (e.g., lime scale), 

slurry or other hazardous deposits.
Water connections must be made in a rational 

way using the couplings on the boiler template. 

The boiler safety valves outlet must be connected 

to a draining funnel. Otherwise, the manufactur-

er declines any responsibility in case of flooding 

if the drain valve cuts in.

Attention:

 Immergas declines all liability in the 

event of damage caused by the inclusion of auto-

matic filling that is not its own brand.
In order to meet the system requirements es-

tablished by the technical regulation in force in 

relation to the pollution of drinking water, we 

recommend installing the IMMERGAS anti-

backflow kit to be used upstream of the cold 

water inlet connection of the boiler. It is also 

recommended that the heat transfer fluid (e.g. 

water + glycol) entered in the primary circuit 

of the boiler (heating circuit), complies with the 

local regulations in force.

Attention:

 to preserve the duration and the ef-

ficiency features of the appliance, in the presence 

of water whose features can lead to the deposit of 

scale, installation of the “polyphosphate dispenser” 

kit is recommended.

Condensate drain.

 To drain the condensate 

produced by the appliance, it is necessary to 

connect to the drainage system by means of acid 

condensate resistant pipes, with an internal Ø of 

at least 13 mm. The system connecting the appli-

ance to the drainage system must be carried out 

in such a way as to prevent freezing of the liquid 

contained in it. Before appliance ignition, ensure 

that the condensate can be correctly removed. 

After first ignition, check that the drain trap is 

filled with condensate (para. 1.21). Also, comply 

with national and local regulations on discharg-

ing waste waters.

1.6  ELECTRICAL CONNECTION. 

The “Victrix Zeus Superior ErP” boiler has an 

IPX5D protection rating for the entire appliance. 

Electrical safety of the appliance is reached only 

when it is correctly connected to an efficient 

earthing system as specified by current safety 

standards.

Attention:

 Immergas S.p.A. declines any respon-

sibility for damage or physical injury caused by 

failure to connect the boiler to an efficient earth 

system or failure to comply with the reference 

standards.
Also ensure that the electrical installation cor-

responds to maximum absorbed power specifica-

tions as shown on the boiler data-plate. Boilers 

are supplied complete with an “X” type power 

cable without plug. The power supply cable must 

be connected to a 230V ±10% / 50Hz mains sup-

ply respecting L-N polarity and earth connection; 

, this network must also have a multi-pole cir-

cuit breaker with class III over-voltage category. 

When replacing the power supply cable, contact 

a qualified firm (e.g. the Authorised After-Sales 

Technical Assistance Service). The power cable 

must be laid as shown (Fig. 1-3).

In the event of mains fuse replacement on the 

P.C.B., use a 3.15A quick-blow fuse. For the main 

power supply to the appliance, never use adapt-

ers, multiple sockets or extension leads.

Installation with system operating at direct 

low temperature.

 The boiler can directly feed a 

low temperature system by acting on parameter 

“P66” (Par. 3.8) and setting the delivery tempera-

ture adjustment range “P66/A” and “P66/B”. In 

this situation it is good practice to insert a safety 

device in series with the power supply and boiler. 

This device is made up from a thermostat with 

a temperature limit of  60°C. The thermostat 

must be positioned on the system delivery pipe 

at a distance of at least 2 metres from the boiler.

SUPPLY  

VOLTAGE CABLE

Содержание VICTRIX ZEUS SUPERIOR

Страница 1: ...VICTRIX ZEUS SUPERIOR 26 2 32 2 ERP Instruction and recommendation booklet IE 1 037935ENG...

Страница 2: ......

Страница 3: ...ofessionals within the dimensional limits established by the Law Installation and maintenance must be performed in compliance with the regulations in force according to the manufacturer s instructions...

Страница 4: ...e 20 2 2 General warnings 20 2 3 Control panel 20 2 4 Description of functioning states 21 2 5 Using the boiler 22 2 6 Troubleshooting 23 2 7 Parameters and information menu 25 2 8 Boiler shutdown 26...

Страница 5: ...a draining funnel or if there are leaks from the hydraulic connections on the contrary the manufacturer cannot be held responsible for any damage caused to the household appliances For the aforementio...

Страница 6: ...uid must be followed scrupulously regarding the percentage neces sary with respect to the minimum temperature at which the system must be kept An aqueous solution must be made with potential pollution...

Страница 7: ...et the system requirements es tablished by the technical regulation in force in relation to the pollution of drinking water we recommend installing the IMMERGAS anti backflow kit to be used upstream o...

Страница 8: ...t to On Off mode CAR V2 Super CAR or On Off chrono ther mostat electrical connection Optional The operations described below must be performed after having removed the voltage from the appli ance Any...

Страница 9: ...efore varies according to applica tions for air intake or flue exhaust Each single component has a resistance corresponding to a certain length in metres of pipe of the same diameter the so called equ...

Страница 10: ...Intake and Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric intake exhaust terminal 60 100 vertical Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Exhaust m...

Страница 11: ...in the female end with lip seal of the 80 flange unit until it stops Introduce the gasket making it run along the bend Fix it using the sheet steel plate and tighten by means of the straps present in...

Страница 12: ...with the boiler flange and tighten using the screws supplied with the kit Fit the 60 100 3 concentric terminal pipe with the male side smooth to the female side of the bend 2 up to the end stop makin...

Страница 13: ...cal length of 14 4 m including the terminal This configuration corresponds to a resistance factor of 100 In this case specific extensions must be requested Vertical kit with aluminium tile 80 125 Kit...

Страница 14: ...oth in the female side of the bend 5 up to the end stop ensuring that the internal and external wall sealing plates are fitted Fit the exhaust pipe 9 with the male side smooth to the female side of th...

Страница 15: ...ical data The dimensions of the shafts must ensure a minimum gap between the outer wall of the smoke duct and the inner wall of the shaft 30 mm for circular section shafts and 20 mm in the event of a...

Страница 16: ...he chimney technical slot The maximum possible length of the 80 rigid ducting vertical section is equal to 30 m This length is obtained considering the complete 80 exhaust terminal 1m of 80 pipe in ex...

Страница 17: ...gas may come out the condensate drain after a few minutes operation check that this no longer occurs This means that the drain trap is filled with conden sate to the correct level preventing the passa...

Страница 18: ...he system flow and return accord ing to set value K Fixed 100 65 in this mode the cir culator works at constant speed the operating range is defined between minimum 65 and maximum 83 for Victrix Zeus...

Страница 19: ...e functioning possibilities Cover kit on request If installed outdoors in a partially protected place with direct air intake it is compulsory to mount the appropriate top protection cover for the corr...

Страница 20: ...horised local firm 2 2 GENERAL WARNINGS Never expose the wall mounted boiler to direct vapours from cooking hobs Use of the boiler by unskilled persons or children is prohibited For safety purposes ch...

Страница 21: ...uest for domestic hot water or central heating in order to evacuate residual flue gas F5 Postcirculation in progress Pump in function after a request for domestic hot water or central heating in order...

Страница 22: ...ection it decreases During domestic hot water heating DHW ON appears on the display 24 on the status indicator 6 and at the same time as the burner ignites the flame presence indicator switches on 8 w...

Страница 23: ...pressure is between 1 1 2 bar and restore the correct pressure if necessary 12 Storage tank probe anomaly The board detects an anomaly on the storage tank probe The boiler cannot produce domestic hot...

Страница 24: ...flame signal This occurs when the boiler is ignited correctly and the burner flame switches off unexpectedly a new ignition attempt is performed and if normal conditions are restored the boiler does...

Страница 25: ...els of the menu and the choice of parameters is confirmed Press button C to go back one level M1 information menu This menu contains the various information relative to boiler functioning 1st Level Bu...

Страница 26: ...i freezeliquidandinstallation of the Immergas Anti freeze Kit in the boiler In the case of prolonged inactivity second case we also recommend that disconnect the electric power supply fully drain the...

Страница 27: ...production of domestic hot water check sealing efficiency of water circuits check ventilation and or aeration of the instal lation room where provided If even only a single safety check offers a negat...

Страница 28: ...ed by the drain trap being blocked Check by means of the condensate drain cap that there are no residues of material blocking the flow of condensate Noise due to air in the system Check open ing of th...

Страница 29: ...casing mounted while the gas valve calibration operations must be carried out with the casing open and disconnecting the boiler from the power supply Calibration of the minimum CO2 minimum heating pow...

Страница 30: ...on the domestic hot water probe on entry to the boiler P54 2 Displays the temperature read on the domestic hot water probe on exit from the boiler P54 3 Displays the temperature read on the return pr...

Страница 31: ...in the cylinder falls by 3 C with respect to the temperature set Solar function deactivated P71 1 P71 2 5 C Boiler ignition for heating the domestic hot water occurs when the water contained in the cy...

Страница 32: ...rts the pump at least once every 24 hours for the duration of 30 seconds in order to reduce the risk of the pump becoming blocked due to prolonged inactivity 3 11 THREE WAY ANTI BLOCK FUNCTION Both in...

Страница 33: ...that it is properly fixed to the combustion chamber lid otherwise it must be replaced Visually check that the water safety drain valve is not clogged Check that after discharging system pressure and b...

Страница 34: ...wer grid 1 by taking out the 4 fastening screws 2 Open the control panel door 3 remove the 2 white screw caps 4 and take out the 2 fasten ing screws 5 tilt the panel towards you Unscrew the 2 6 fasten...

Страница 35: ...0 92 9 4 0 81 1 28 13 1 9 0 7740 1 00 0 73 7 4 0 75 0 77 7 9 0 73 1 09 11 1 8 0 6880 0 89 0 59 6 0 0 67 0 64 6 5 0 66 0 90 9 2 7 0 6020 0 78 0 46 4 7 0 59 0 52 5 3 0 58 0 73 7 5 6 0 5160 0 67 0 35 3...

Страница 36: ...0 7 670 11 270 7 NOX at 0 of O2 at Q Nom Min mg kWh 39 22 108 50 43 30 Flue temperature at nominal output C 78 86 79 Flue temperature at minimum output C 73 82 75 Victrix Zeus Superior 32 2 ErP Gas no...

Страница 37: ...h 25 8 22188 32 0 27520 Domestic hot water adjustable temperature C 10 60 10 60 Domestic hot water circuit flow limiter at 2 bar l min 8 7 12 6 Domestic hot water circuit min pressure dynamic bar 0 3...

Страница 38: ...Cod Md Model code Sr N Serial Number CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min CH minimum heat input Qnw max DHW maximum heat input Qn...

Страница 39: ...ns 60 C on return and 80 C on flow Low temperature mode for condensation Boilers means 30 C for low temperature boilers 37 C and for other appliances 50 C of return tempera ture Model s Victrix Zeus S...

Страница 40: ...mestic hot water function AFC 18 GJ Seasonal room heating yield s 92 Domestic hot water production yield wh 82 Parameter value Yearly energy consumption for the heating function QHE 61 2 GJ Yearly ele...

Страница 41: ...ementary heat pump From fiche of heat pump Solar contribution and Supplementary heat pump Select smaller value Boiler and supplementary heat pump installed with low temperature heat emitters at 35 C F...

Страница 42: ...35 C From fiche of heat pump The energy efficiency of the package of products provided far in this fiche may not correspond to its actual energy efficiency once installed in a building as the efficien...

Страница 43: ...y electricity 3 G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39 50 55 60 65 75 80 85 100 115 123 131 130 150 160 170 163 188 200 213 M L XL XXL 3 2 3 2 The energy ef...

Страница 44: ...Water heating energy efficiency under colder and warmer climate conditions Colder 0 2 x Warmer 0 4 x Declared load profile Solar contribution From fiche of solar device 1 I 2 1 1 x I 10 x II III I Aux...

Страница 45: ...45...

Страница 46: ...46...

Страница 47: ...47...

Страница 48: ...mmergas com Immergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 037935ENG rev ST 001312 001 09...

Отзывы: