background image

12

C

13

1-13

C

13

1-14

1-16

C

13

C

13

5

4

3

1

2

1

2

3

4

5

6

1-15

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

The adaptor kit includes:

N° 1 -  Gasket (1)

 N° 1 -  Adaptor Ø 80/125 (2)

The Kit Ø 80/125 includes:

N° 1 -  Concentric bend Ø 80/125 a 

87° (3)

 N° 1  -  Int./exhaust concentric termi-

nal Ø 80/125 (4)

 N° 1 -  Internal wall sealing plate (5)

 N° 1  -  External wall sealing plate (6)

The remaining kit components must 

not be used

The kit includes:

N° 1 - Gasket (1)

N° 1 - Concentric bend Ø 60/100 (2)

N° 1 - Int./exhaust concentric terminal Ø 60/100 (3)

N° 1 - Internal wall sealing plate (4)

N° 1 - External wall sealing plate (5)

1.12 CONCENTRIC HORIZONTAL  

KIT INSTALLATION.

Type C configuration, sealed chamber and 

fan assisted.

The position of the terminal (in terms of dis-

tances from openings, overlooking buildings, 

floor, etc.) must be in compliance with the 

regulations in force.
This terminal is connected directly to the outside 

of the building for air intake and flue exhaust. The 

horizontal kit can be installed with the rear, right 

side, left side or front outlet. For installation with 

frontal outlet, one must use the fixing plate and 

a concentric bend coupling in order to ensure 

sufficient space to carry out the tests required 

by law upon commissioning.
•  External grid. Both the Ø 60/100 and Ø 80/125 

intake/exhaust terminal, if properly installed, is 

pleasant to look at on the outside of the build-

ing. Make sure that the external silicone wall 

sealing plate is properly inserted in the wall. 

 

N.B.:

 for proper system operation the terminal 

with grid must be installed correctly ensuring 

that, the "high" indication on the terminal is 

observed during installation.

Horizontal intake-exhaust kit Ø 60/100 

Kit 

assembly (Fig. 1-13): install the bend with flange 

(2) on the central hole of the boiler, positioning 

gasket (1) with the circular projections down-

wards in contact with the boiler flange, and 

tighten using the screws supplied with the kit. Fit 

the Ø 60/100 (3) concentric terminal pipe with 

the male side (smooth) to the female side of the 

bend (2) up to the end stop; making sure that the 

internal and external wall sealing plate have been 

fitted, this will ensure sealing and joining of the 

elements making up the kit.
• Extensions for Ø 60/100 horizontal kit (Fig. 

1-14). The kit with this configuration can be 

extended up to a 

max. 12.9 horizontal m

 in-

cluding the terminal with grid and excluding 

the concentric bend leaving the boiler. This 

configuration corresponds to a resistance factor 

of 100. In this case the special extensions must 

be requested.

Immergas also provides a Ø 60/100 simplified 

terminal, which in combination with its exten-

sion kits allows you to reach a maximum exten-

sion of 11.9 metres.

Horizontal intake-exhaust kit Ø 80/125 

Kit 

assembly (Fig. 1-15): to install the kit Ø 80/125 

one must use the flanged adapter kit in order 

to install the flue system Ø 80/125. Install the 

flanged adaptor (2) on the central hole of the 

boiler, positioning gasket (1) with the circular 

projections downwards in contact with the boiler 

flange and tighten using the screws supplied with 

the kit. Engage the bend (3) with the male side 

(smooth) to the end stop on the adapter (1). Fit 

the Ø 80/125 (5) concentric terminal pipe with 

the male side (smooth) to the female side of the 

bend (4) (with lip seals) up to the end top; making 

sure that the internal (6) and external wall sealing 

plate (7) have been fitted, this will ensure sealing 

and joining of the elements making up the kit.
• Extensions for horizontal kit Ø 80/125 (Fig. 

1-16). The kit with this configuration can be 

extended up to a 

max. length of 32 m

, includ-

ing the terminal with grid and excluding the 

concentric bend leaving the boiler. If addi-

tional components are assembled, the length 

equivalent to the maximum allowed must be 

subtracted. In this case the special extensions 

must be requested.

Max. 12900 mm)

Max. 32000 mm)

Max. 31956 mm)

Содержание VICTRIX ZEUS SUPERIOR

Страница 1: ...VICTRIX ZEUS SUPERIOR 26 2 32 2 ERP Instruction and recommendation booklet IE 1 037935ENG...

Страница 2: ......

Страница 3: ...ofessionals within the dimensional limits established by the Law Installation and maintenance must be performed in compliance with the regulations in force according to the manufacturer s instructions...

Страница 4: ...e 20 2 2 General warnings 20 2 3 Control panel 20 2 4 Description of functioning states 21 2 5 Using the boiler 22 2 6 Troubleshooting 23 2 7 Parameters and information menu 25 2 8 Boiler shutdown 26...

Страница 5: ...a draining funnel or if there are leaks from the hydraulic connections on the contrary the manufacturer cannot be held responsible for any damage caused to the household appliances For the aforementio...

Страница 6: ...uid must be followed scrupulously regarding the percentage neces sary with respect to the minimum temperature at which the system must be kept An aqueous solution must be made with potential pollution...

Страница 7: ...et the system requirements es tablished by the technical regulation in force in relation to the pollution of drinking water we recommend installing the IMMERGAS anti backflow kit to be used upstream o...

Страница 8: ...t to On Off mode CAR V2 Super CAR or On Off chrono ther mostat electrical connection Optional The operations described below must be performed after having removed the voltage from the appli ance Any...

Страница 9: ...efore varies according to applica tions for air intake or flue exhaust Each single component has a resistance corresponding to a certain length in metres of pipe of the same diameter the so called equ...

Страница 10: ...Intake and Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric intake exhaust terminal 60 100 vertical Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Exhaust m...

Страница 11: ...in the female end with lip seal of the 80 flange unit until it stops Introduce the gasket making it run along the bend Fix it using the sheet steel plate and tighten by means of the straps present in...

Страница 12: ...with the boiler flange and tighten using the screws supplied with the kit Fit the 60 100 3 concentric terminal pipe with the male side smooth to the female side of the bend 2 up to the end stop makin...

Страница 13: ...cal length of 14 4 m including the terminal This configuration corresponds to a resistance factor of 100 In this case specific extensions must be requested Vertical kit with aluminium tile 80 125 Kit...

Страница 14: ...oth in the female side of the bend 5 up to the end stop ensuring that the internal and external wall sealing plates are fitted Fit the exhaust pipe 9 with the male side smooth to the female side of th...

Страница 15: ...ical data The dimensions of the shafts must ensure a minimum gap between the outer wall of the smoke duct and the inner wall of the shaft 30 mm for circular section shafts and 20 mm in the event of a...

Страница 16: ...he chimney technical slot The maximum possible length of the 80 rigid ducting vertical section is equal to 30 m This length is obtained considering the complete 80 exhaust terminal 1m of 80 pipe in ex...

Страница 17: ...gas may come out the condensate drain after a few minutes operation check that this no longer occurs This means that the drain trap is filled with conden sate to the correct level preventing the passa...

Страница 18: ...he system flow and return accord ing to set value K Fixed 100 65 in this mode the cir culator works at constant speed the operating range is defined between minimum 65 and maximum 83 for Victrix Zeus...

Страница 19: ...e functioning possibilities Cover kit on request If installed outdoors in a partially protected place with direct air intake it is compulsory to mount the appropriate top protection cover for the corr...

Страница 20: ...horised local firm 2 2 GENERAL WARNINGS Never expose the wall mounted boiler to direct vapours from cooking hobs Use of the boiler by unskilled persons or children is prohibited For safety purposes ch...

Страница 21: ...uest for domestic hot water or central heating in order to evacuate residual flue gas F5 Postcirculation in progress Pump in function after a request for domestic hot water or central heating in order...

Страница 22: ...ection it decreases During domestic hot water heating DHW ON appears on the display 24 on the status indicator 6 and at the same time as the burner ignites the flame presence indicator switches on 8 w...

Страница 23: ...pressure is between 1 1 2 bar and restore the correct pressure if necessary 12 Storage tank probe anomaly The board detects an anomaly on the storage tank probe The boiler cannot produce domestic hot...

Страница 24: ...flame signal This occurs when the boiler is ignited correctly and the burner flame switches off unexpectedly a new ignition attempt is performed and if normal conditions are restored the boiler does...

Страница 25: ...els of the menu and the choice of parameters is confirmed Press button C to go back one level M1 information menu This menu contains the various information relative to boiler functioning 1st Level Bu...

Страница 26: ...i freezeliquidandinstallation of the Immergas Anti freeze Kit in the boiler In the case of prolonged inactivity second case we also recommend that disconnect the electric power supply fully drain the...

Страница 27: ...production of domestic hot water check sealing efficiency of water circuits check ventilation and or aeration of the instal lation room where provided If even only a single safety check offers a negat...

Страница 28: ...ed by the drain trap being blocked Check by means of the condensate drain cap that there are no residues of material blocking the flow of condensate Noise due to air in the system Check open ing of th...

Страница 29: ...casing mounted while the gas valve calibration operations must be carried out with the casing open and disconnecting the boiler from the power supply Calibration of the minimum CO2 minimum heating pow...

Страница 30: ...on the domestic hot water probe on entry to the boiler P54 2 Displays the temperature read on the domestic hot water probe on exit from the boiler P54 3 Displays the temperature read on the return pr...

Страница 31: ...in the cylinder falls by 3 C with respect to the temperature set Solar function deactivated P71 1 P71 2 5 C Boiler ignition for heating the domestic hot water occurs when the water contained in the cy...

Страница 32: ...rts the pump at least once every 24 hours for the duration of 30 seconds in order to reduce the risk of the pump becoming blocked due to prolonged inactivity 3 11 THREE WAY ANTI BLOCK FUNCTION Both in...

Страница 33: ...that it is properly fixed to the combustion chamber lid otherwise it must be replaced Visually check that the water safety drain valve is not clogged Check that after discharging system pressure and b...

Страница 34: ...wer grid 1 by taking out the 4 fastening screws 2 Open the control panel door 3 remove the 2 white screw caps 4 and take out the 2 fasten ing screws 5 tilt the panel towards you Unscrew the 2 6 fasten...

Страница 35: ...0 92 9 4 0 81 1 28 13 1 9 0 7740 1 00 0 73 7 4 0 75 0 77 7 9 0 73 1 09 11 1 8 0 6880 0 89 0 59 6 0 0 67 0 64 6 5 0 66 0 90 9 2 7 0 6020 0 78 0 46 4 7 0 59 0 52 5 3 0 58 0 73 7 5 6 0 5160 0 67 0 35 3...

Страница 36: ...0 7 670 11 270 7 NOX at 0 of O2 at Q Nom Min mg kWh 39 22 108 50 43 30 Flue temperature at nominal output C 78 86 79 Flue temperature at minimum output C 73 82 75 Victrix Zeus Superior 32 2 ErP Gas no...

Страница 37: ...h 25 8 22188 32 0 27520 Domestic hot water adjustable temperature C 10 60 10 60 Domestic hot water circuit flow limiter at 2 bar l min 8 7 12 6 Domestic hot water circuit min pressure dynamic bar 0 3...

Страница 38: ...Cod Md Model code Sr N Serial Number CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min CH minimum heat input Qnw max DHW maximum heat input Qn...

Страница 39: ...ns 60 C on return and 80 C on flow Low temperature mode for condensation Boilers means 30 C for low temperature boilers 37 C and for other appliances 50 C of return tempera ture Model s Victrix Zeus S...

Страница 40: ...mestic hot water function AFC 18 GJ Seasonal room heating yield s 92 Domestic hot water production yield wh 82 Parameter value Yearly energy consumption for the heating function QHE 61 2 GJ Yearly ele...

Страница 41: ...ementary heat pump From fiche of heat pump Solar contribution and Supplementary heat pump Select smaller value Boiler and supplementary heat pump installed with low temperature heat emitters at 35 C F...

Страница 42: ...35 C From fiche of heat pump The energy efficiency of the package of products provided far in this fiche may not correspond to its actual energy efficiency once installed in a building as the efficien...

Страница 43: ...y electricity 3 G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39 50 55 60 65 75 80 85 100 115 123 131 130 150 160 170 163 188 200 213 M L XL XXL 3 2 3 2 The energy ef...

Страница 44: ...Water heating energy efficiency under colder and warmer climate conditions Colder 0 2 x Warmer 0 4 x Declared load profile Solar contribution From fiche of solar device 1 I 2 1 1 x I 10 x II III I Aux...

Страница 45: ...45...

Страница 46: ...46...

Страница 47: ...47...

Страница 48: ...mmergas com Immergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 037935ENG rev ST 001312 001 09...

Отзывы: