13
C
33
C
33
C
33
7
4
6
5
1
2
3
1
2
3
4
5
6
7
1-17
1-19
1-18
1-16
C
33
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
The kit includes:
N° 1 - Gasket (1)
N° 1 - Female concentric flange (2)
N° 1 - Wall sealing plate (3)
N° 1 - Aluminium tile (4)
N° 1 - Int./exhaust concentric pipe
Ø60/100 (5)
N° 1 - Fixed half-shell (6)
N° 1 - Mobile half-shell (7)
The adapter Kit includes:
N° 1 - Gasket (1)
N° 1 - Adapter
Ø80/125 (2)
The Kit Ø80/125 includes:
N° 1 - Wall sealing plate (3)
N° 1 - Aluminium tile (4)
N° 1 - Fixed half-shell (5)
N° 1 - Mobile half-shell (6)
N° 1 - Int./exhaust concentric
pipe Ø80/125 (7)
The remaining components of the
kit are not to be used
1.13 VERTICAL CONCENTRIC KIT
INSTALLATION.
Type C configuration, sealed chamber and
fan assisted.
Vertical concentric of intake and exhaust kit.
This terminal enables the air intake and the flue
exhausts to be directly emitted outside the house
in a vertical direction.
N.B.:
the vertical kit with aluminium tile
enables installation on terraces and roofs with
a maximum slope of 45% (approximately 25°)
and the height between the terminal cap and
half-shell (374 mm for Ø60/100 and 260 mm for
Ø80/125) must always be respected.
Vertical kit with aluminium tile Ø60/100.
Kit assembly (Fig. 1-16): install the concentric
flange (2) on the central hole of the boiler,
positioning the gasket (1) with the circular
projections downwards in contact with the boiler
flange and tighten using the screws present in
the kit.
Imitation aluminium tile installation: replace the
tile with the aluminium sheet (4), shaping it to
ensure that rainwater runs off. Position the fixed
half-shell (6) and insert the intake-exhaust pipe
(5). Fit the Ø60/100 (3) concentric terminal pipe
with the male end (5) (smooth) into the flange (2)
up to the stop; making sure that the wall sealing
plate has been fitted (3), this will ensure sealing
and joining of the elements making up the kit.
N.B.:
when the boiler is installed in areas where
very rigid temperatures can be reached, a special
anti-freeze kit is available that can be installed as
an alternative to the standard kit.
• Extensions for vertical kit Ø60/100 (Fig. 1-17).
The vertical kit with this configuration
can be extended to
a max. straight vertical
length of 14.4 m
including the terminal. This
configuration corresponds to a resistance factor
of 100. In this case the special extensions must
be requested.
Vertical kit with aluminium tile Ø80/125.
Kit assembly (Fig. 1-18): for the installation of kit
Ø80/125 the flanged adapter kit must be used to
be able to install the flue system Ø80/125. Install
the flanged adapter (2) on the central hole of the
boiler, positioning the gasket (1) with the circular
projections downwards in contact with the boiler
flange and tighten using the screws preset in the
kit. Imitation aluminium tile installation: replace
the tile with the aluminium sheet (4), shaping
it to ensure that rainwater runs off. Position
the fixed half-shell (5) on the aluminium tile
and insert the intake-exhaust pipe (7). Fit the
Ø80/125 concentric terminal pipe with the male
end (smooth) to the female end of the adapter
(1) (with lip gasket) up to the stop; making sure
that the wall sealing plate has been fitted (3), this
will ensure sealing and joining of the elements
making up the kit.
• Extensions for vertical kit Ø80/125 (Fig. 1-19).
The vertical kit with this configuration can be
extended to a
max. length of 32 m
including
the terminal. If additional components are
assembled, the length equivalent to the
maximum allowed must be subtracted. In this
case specific extensions must be requested.
STD.002229/002
Содержание VICTRIX ZEUS SUPERIOR 32 2 ERP
Страница 1: ...VICTRIX SUPERIOR 32 2 ERP Instruction and warning book IE 1 037985ENG STD 002229 002 ...
Страница 2: ...STD 002229 002 ...
Страница 44: ...44 STD 002229 002 ...
Страница 45: ...45 STD 002229 002 ...
Страница 46: ...46 STD 002229 002 ...
Страница 47: ...47 STD 002229 002 ...