1
Boiler installation. .....................................4
1.1 Installation recommendations. ................4
1.2 Main dimensions. ......................................4
1.3 Gas connection. .........................................5
1.4 Hydraulic connection. ..............................5
1.5 Electrical connection. ...............................5
1.6 Remote controls and room
chronothermostats (optional). ................5
1.7 Ventilation of the rooms...........................6
1.8 Evacuation of combustion products: flue
duct and branched multiple flues ...........6
1.9 Flue exhaust control device ......................6
1.10 System filling. .............................................6
1.11 Gas system start-up. ..................................6
1.12 Boiler start up (ignition). .........................6
1.13 Circulation pump. .....................................7
1.14 Kits available on request. ..........................8
1.15 Boiler components. ...................................9
2
Instructions for use and maintenance. .10
2.1 Cleaning and maintenance. ...................10
2.2 Ventilation of the rooms.........................10
2.3 General warnings. ...................................10
2.4 Control panel. ..........................................10
2.5 Faults and anomaly signals. ...................11
2.6 Boiler shutdown. ....................................12
2.7 Restore heating system pressure............12
2.8 System draining. ......................................12
2.9 Anti-freeze protection. ...........................12
2.10 Case cleaning. ..........................................12
2.11 Decommissioning. ..................................12
3
Boiler start-up. (Initial check) ...............13
3.1 Hydraulic layout. .....................................13
3.2 Wiring diagram. ......................................14
3.3 Troubleshooting. .....................................14
3.4 Converting the boiler to other
types of gas. ..............................................14
3.5 Checks following conversion to another
type of gas. ................................................15
3.6 Possible adjustments. ..............................15
3.7 Programming the p.C.B. ........................15
3.8 Automatic slow ignition function with
timed ramp delivery. ...............................16
3.9 “Chimney sweep function”. ....................16
3.10 Heating timer. ..........................................16
3.11 Pump anti-block function. .....................16
3.12 Domestic hot water circuit anti-extruder
function. ...................................................16
3.13 Radiators anti-freeze function. ..............16
3.14 P.C.B. Periodical self-check. ...................16
3.15 Casing removal. .......................................17
3.16 Yearly appliance check and
maintenance. ............................................17
3.17 Variable heat power. ................................19
3.18 Combustion parameters. ........................19
3.19 Technical data. .........................................20
3.20 Data plate key. ..........................................21
3.21 Technical parameters for combination
boilers (in compliance with regulation
813/2013)..................................................22
3.22 Product fiche (in compliance with
regulation 811/2013). ..............................22
3.23 Parameters for filling in
the package fiche. ....................................23
INDEX
USER
page
INSTALLER
page
MAINTENANCE TECHNICIAN
page
Содержание Nike Star 24 4 ErP
Страница 18: ...18 3 4 3 2 2 4 1 INSTALLER USER MAINTENANCE TECHNICIAN ...
Страница 27: ...27 ...