26
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
- using keys (3) and (4), select the parameter to
be changed indicated in the following table:
- adjust the corresponding value consulting the
table using buttons (5) and (6);
- confirm the value set by pressing the Reset
button (1) for about 5 seconds.
Note:
2 minutes after no button is touched
will automatically cancel the operation or by
pressing buttons (1) and (2) simultaneously
for about 5 seconds.
3.7 PROGRAMMING THE P.C.B.
The boiler is prepared for possible programming
of several operation parameters. By modifying
these parameters as described below, the boiler
can be adapted according to specific needs.
To access the programming phase, proceed as
follows (references Fig. 2-1):
- press buttons (1) and (2) for 5 about seconds
until the programming mode is accessed on
the display;
Id
Parameter
Parameter
Description
Range
(ref. 9 Fig. 2-1)
Default
P01
Gas type selec-
tion
The setting of this function is used to adjust the boiler so that it can operate with the
correct type of gas
nG - Methane
LG - LPG
Set accor-
ding to the
gas being
used
P02
Heating swi-
tch-on delay
request from
room thermos-
tat and remote
control.
The boiler is set to switch-on 3 seconds after the request. In the event of particular
systems (e.g. area systems with motorised thermostatic valves etc.) it may be necessa-
ry to delay ignition
0 - 20
(00 = 3 seconds
01 = 30 seconds
02 = 1 minute
20 = 10 minu-
tes)
0
P03
Fixed or corre-
lated domestic
hot water set-
point
By setting the parameter P3 in
on
mode, burner disabling is correlated to the
adjustment of the domestic hot water temperature. In
OFF
mode, the burner is swit-
ched off at maximum value.
on
- correlated
oF -
fixed
oF
P05
Minimum CH
output
The boiler also has electronic modulation that adapts the boiler potentiality to the
effective heating demand of the house. Then the boiler works normally in a variable
gas pressure field between the minimum heating output and the maximum heating
output depending on the system's heating load.
Note:
the boiler is produced and calibrated in the central heating phase at nominal
output. Approximately 10 minutes are needed to reach the nominal heat output,
which can be changed using the parameter (P06).
Note:
the selection of the “Minimum heating output” and “Maximum heating output”
parameters, in presence of a heating request, allows boiler ignition and power supply
of the modulator with current equal to the value of the respective set value.
0 - 63 %
Set
according
to factory
inspection
P06
Maximum central
heating output
0 - 100 %
Set
according
to factory
inspection
P07
Central heating
ignitions timer
The boiler has electronic timing, which prevents the burner from igniting too often in
central heating mode.
0 - 10 minutes
(0 = 30 se-
conds)
3
P08
Central heating
ramp timer
In the ignition phase, the boiler performs an ignition ramp in order to arrive at the
maximum nominal power set.
0 - 10 minutes
(0 = 30 se-
conds)
10
P10
Power
ignition
Establishes the power at which the boiler must switch on. The 1st gas valve step soft
ignition step can be set. The ignition power increases as the parameter value is increased.
0 - 40
0
P13
Temperature
gradient
Change the insufficient circulation intervention value (E27)
0 - 15
(0 = Function
deactivated)
11
P14
Boiler type
Establishes the boiler type and its functioning mode
1
= open chamber boiler (NIKE)
2
= sealed chamber boiler (EOLO)
1 - 2
2
P15
Gas valve cali-
bration
Allows the gas valve to be calibrated
5
= complete calibration
different from 5
= calibration correction
0 - 20
0
P16
Valve check
Attention: do not change this parameter
0 - 2
2
P17
(if it’s
present)
Flow off tempera-
ture increase
(Central heating)
Increases the flow off temperature at ignition only in the first 30 seconds.
on - oF
on
Note:
parameters P00, P04, P09, P11 and P12 are not used for this boiler model.
Содержание EOLO MYTHOS DOM 10 1E
Страница 1: ...EOLO MYTHOS DOM 10 18 24 1E Instructions and warning book 1 041321ENG ...
Страница 2: ......
Страница 34: ...34 ...
Страница 35: ...35 ...